EMERGENCY
RESPONSE
Life saving measures
protection of public
property
evacuation &
sheltering
temporary facilities
debris removal
private property
debris removal
debris removal
Monitoring
mutual aid support
EMAC Mutual Aid
emergency work
labor
emergency
procurement
DAMAGED
ASSETS
cost estimating
Repair or Replacement
Flood Damaged
Buildings
temporary facilities &
operating costs
Alternative Projects
outside assets
codes & standards
roads & bridges
hazard mitigation
grant
management
PRIMARY DAMAGE
ASSESSMENT
DISASTER DECLARATION
DAMAGE INVENTORY
Temporary Facilities
Assistance Delivery Model
DOCUMENTATION REQUIREMENTS
ELIGILIBITY APPEALS
CLOSEOUT PROCEDURES
SINGLE AUDIT
PA Grant
compliance
Exigent or Emergency Procurement
2 CFR Part 200 - UNIFORM ADM
procurement & contracts
ENVIRONMENTAL Compliance
duplication of benefits
documentation & records
Grantee & OIG Audits
POLICY FAQ
Helpful
information
search site
Knowledge Base
FEMA PA Policy FAQ
Resource Links
Policy Appeals
OIG Audits
FEMA news FEEDS
About US
Terms & Conditions
APPEAL CATEGORIES
Administrative Costs
Alternate Project
Appeals
Beaches
Bridges
Codes & Standards
Contract Services
Contracts Cost-Plus-%-of-Costs
Damage Surveys
Debris Removal
Debris Removal Construction/Demolition
Debris Removal Soil, Silt, Rock
Debris Removal Vegetative
Debris Removal Waterways
Deferred Maintenance
Direct Administrative Costs
Direct Result of Disaster
Documentation
Duplication of Benefits
Eligibility
Emergency Protective Measures
Emergency Public Transportation
Engineering and Design Services
Environmental Compliance
Equipment
Facility Eligibility
Flood Control Works (FCW's)
Force Account Emergency Labor
Force Account Labor
Force Account Labor Overtime Costs
Hazard Mitigation
Immediate Threat
Improved Project
Improved Projects
Increased Operations Cost
Insurance
Insurance Waiver
Legal Responsibility
Legal Responsibility Other Agencies
Legal Responsibility Private Entity
Mutual Aid Agreements
Net Small Project Overrun
OIG Audit Report
Overtime Costs
Permanent Work
Pre-Disaster Conditions
Private Non-Profit
Procurement
Reasonable Cost
Regulatory Timeline
Repair to pre-disaster conditions
Replacement Costs
Request for Public Assistance
Road Repair
Sales Tax
Sand Replacement
Scope of Work
Slope Failures
Snow Removal
Support Documentation
Temporary Facilities
The 50% Rule
Time Extension
Time Extension Work
FEMA APPEAL SUMMARY AVAILABLE FOR VIEW
Appeals
No items found.