Home / Laws & Policy / PAPPG Explorer / Chapter 4
PAPPG v5.0 · Chapter 4 · pages 60–69

General Facility and Work Eligibility

The tests every facility and every piece of work must pass before FEMA looks at costs: what counts as an eligible public facility, what happens when a facility was vacant or already slated for repair, the difference between emergency and permanent work, and the three minimum tests of cause, location and legal responsibility. Every section is written as the question applicants actually ask, with FEMA’s requirements, the records you need, and the exact PAPPG pages.

9 topicsThree tests: cause, area, legal responsibilityCategories A–G and IFacility must be in active use
Jump to a part of the chapter
Chapter 4 › II.B.3.v–viii Jurisdiction, Private Property, Other Federal Agencies, EHP

Can FEMA fund work on private property, or work another federal agency covers?

Private property; work under the authority of other federal agencies; EHP requirements
pp. 68–69
Short answer
Usually not. Work on private property is the owner’s responsibility and generally ineligible, with rare exceptions where you have legal authority to do it. If another federal agency has more specific authority over a facility or type of work, FEMA will not fund it, even if that agency does not pay. Apply to that agency instead.
What FEMA requires
  • Private property: generally ineligible. In rare cases FEMA funds specific limited activities, and you must at minimum have legal authority to do them. FEMA reviews your legal basis and specific authority. See private property debris removal and emergency protective measures on private property in Chapter 7.
  • Other federal agencies: FEMA will not fund facilities or work where another agency’s authority is specifically and exclusively for that type of facility or work, applies to Stafford Act declarations, is specific to the incident or incident type, or was directed by Congress. That includes related activities and costs, even if the other agency provides no funding.
  • Environmental and historic preservation: FEMA reviews every project for compliance with federal EHP laws, regulations and executive orders. You must comply with applicable federal, state, tribal and territorial EHP laws even for work FEMA is not funding. See Chapter 10.
Documentation

Your legal authority for any work on private property, such as the statute or ordinance that allowed it; for work outside your jurisdiction, the agreement or legal basis; and any correspondence with another federal agency about whether its program covers the facility or work.

Watch out · Govstar advice
Federal-aid highways (FHWA Emergency Relief) are the classic example: FEMA will not fund them even if the other agency’s funding falls short. Identify any overlapping federal program early and file with that agency on time.
PAPPG v5.0 pp. 68–69 · 44 CFR 206.226(a) · 2 CFR 200.300
Read this in the PAPPG
Chapter 4 › II.B.3.ii–iv Construction, Leased and Federal Facilities

Who is responsible if the facility was under construction, leased, or federally owned?

Facilities under contract for construction; leased facilities; federal facilities
pp. 67–68
Short answer
FEMA reads the agreement. For facilities under construction, it checks the contract for who handles disaster repairs, builder’s risk insurance, a force majeure clause, and when responsibility transfers back to the owner. For leased facilities, the lease decides; if it is silent, the owner is responsible. Facilities owned and maintained by federal agencies are ineligible.
What FEMA requires
  • Under construction: FEMA checks whether the contract makes the contractor or owner responsible for disaster-related repairs, requires a builder’s risk policy, has a force majeure clause relieving the contractor of responsibility for damage beyond its control, or says when responsibility transfers back to the owner.
  • Leased facilities: whether you own and lease out the facility or lease it from someone else, the lease decides who must repair disaster damage. If it doesn’t say, the owner is responsible.
  • Federal facilities: facilities owned and maintained by federal agencies are ineligible. If a federal agency built a facility and formally designated you as responsible for its operation, maintenance and repairs, FEMA reviews that agency’s authority and the agreement.
<table class="pt-table"><thead><tr><th>Situation</th><th>What FEMA reviews</th><th>Who is responsible</th></tr></thead><tbody><tr><td>Under construction</td><td>The construction contract</td><td>Whoever the contract makes responsible for disaster repairs</td></tr><tr><td>Leased, lease names a party</td><td>The lease agreement</td><td>The party the lease makes responsible</td></tr><tr><td>Leased, lease is silent</td><td>The lease agreement</td><td>The owner</td></tr><tr><td>Lease between two eligible applicants</td><td>The lease agreement</td><td>Funding goes to the one legally responsible</td></tr><tr><td>Federally owned and maintained</td><td>Ownership</td><td>Not eligible</td></tr><tr><td>Built by a federal agency, applicant formally designated responsible</td><td>The agency’s authority and the agreement</td><td>The entity the agreement designates</td></tr></tbody></table>
Documentation

The construction contract (required for facilities under construction), the lease agreement (required for leased facilities), and for facilities built by a federal agency, that agency’s authority and the agreement designating you as responsible for operation, maintenance and repair.

Watch out · Govstar advice
If the contractor carried builder’s risk insurance, or the contract puts disaster repairs on the contractor, FEMA will look there first. Read the risk, insurance and force majeure clauses before you claim the work.
PAPPG v5.0 pp. 67–68 · Stafford Act § 406(e)(2)
Read this in the PAPPG
Chapter 4 › II.B.3 Legal Responsibility

How does FEMA decide the work is our legal responsibility?

Minimum work eligibility: legal responsibility
pp. 66–67
Short answer
For debris removal and emergency protective measures, FEMA asks whether you had jurisdiction over the area or legal authority to do the work at the time of the incident. For permanent work, it asks whether you were responsible for restoring the facility, based on ownership and any written agreements. Ownership is usually enough, unless the facility was leased out or under construction by a contractor.
What FEMA requires
  • Work must be the legal responsibility of the applicant requesting assistance.
  • Debris removal and emergency protective measures: you had jurisdiction over the area or legal authority to do the work at the time of the incident.
  • Permanent work: you were legally responsible for restoring the facility at the time of the incident, based on ownership and any written agreements (for example, for facilities under construction, leased facilities or facilities owned by a federal agency).
  • Ownership is usually enough, provided the facility was not under construction by a contractor or leased to another entity at the time.
  • In general, you are only responsible for activities within your jurisdiction. Work outside it requires a documented legal basis.
Documentation
  • Small projects: a certification that the facility and work are your legal responsibility.
  • Large projects: if needed to validate legal responsibility, one or more of: deed, title, lease agreement (required for leased facilities), bill of sale, land contract, mortgage documents or payments, property tax receipt or bill, real property insurance policy, or the construction contract (required for facilities under construction at the time of the incident).
Watch out · Govstar advice
Work outside your own boundaries is where this test usually fails. If you worked outside your jurisdiction, keep the agreement or legal authority that allowed it, such as a mutual aid agreement.
PAPPG v5.0 pp. 66–67 · 44 CFR 206.223(a)(3)
Read this in the PAPPG
Chapter 4 › II.B.2 Within Designated Area

Does the work have to be inside the declared area?

Minimum work eligibility: within the designated area
pp. 65–66
Short answer
Yes. The facility must be located, and the work performed, in an area designated for the declaration. Sheltering, evacuation and emergency operations center activities are the exception: they may take place outside the area as long as they serve the designated area. Work on a facility outside the area is ineligible, even if it protects a facility inside it.
What FEMA requires
  • The facility must be located, and the work performed, in the designated area.
  • Sheltering, evacuation and EOC activities may occur outside the designated area, but must be for activities resulting from it.
  • Work on a facility outside the designated area is ineligible even if an eligible applicant is legally responsible for it, including work outside the area to protect a facility inside it.
  • Tribal declarations usually do not define geographic areas. For Tribal Nations, FEMA decides eligibility based on legal responsibility and whether the work is required because of the incident.
Documentation

For small and large projects: the facility location (address or GPS coordinates), or a certification that the facility and the work are within the designated area.

Watch out · Govstar advice
Check which categories of work each county is designated for before you claim. An area can be designated for emergency work but not for permanent work.
PAPPG v5.0 pp. 65–66 · 44 CFR 206.223(a)(2)
Read this in the PAPPG
Chapter 4 › II.B.1 Result of Declared Incident

How do we show the damage was caused by the declared disaster?

Minimum work eligibility: result of the declared incident
pp. 62–65
Short answer
All work must pass three tests: it is required because of the declared incident, it is in the designated area, and it is your legal responsibility. For the first, you must show the damage happened during the incident period and was caused directly by the incident, and separate it from anything else, such as earlier damage, wear and tear, deferred maintenance or another event.
What FEMA requires
  • Work must meet three minimum criteria: required as a result of the declared incident, located in the designated area, and the legal responsibility of an eligible applicant.
  • Debris removal: the debris was generated by the incident during the incident period, and removing it addresses an immediate threat caused by the incident.
  • Emergency protective measures: the work addresses an immediate threat caused by the incident.
  • Permanent work, temporary repairs and mold remediation: the work addresses damage caused by the incident.
  • You must separate impacts, damage, work and costs not caused by the incident from those that were.
  • A facility that was functioning before the disaster and was made non-functional by it may be eligible, provided its pre-disaster condition was not a significant contributing factor in the failure.
  • For tribal sacred sites closed to non-members, FEMA accepts the Tribal Nation’s certified damage assessment instead of a site inspection, and does not require photos, site maps or GPS locations where tribal artifacts are located.
<table class="pt-table"><thead><tr><th>Not caused by the declared incident</th><th>Eligible?</th></tr></thead><tbody><tr><td>Damage or debris that existed before the incident</td><td>Not eligible</td></tr><tr><td>Damage from a different incident, even during the incident period</td><td>Not eligible</td></tr><tr><td>Damage after the incident period but before repairs</td><td>Not eligible</td></tr><tr><td>Deterioration (wear and tear) or deferred maintenance</td><td>Not eligible</td></tr><tr><td>Damage from failing to protect the facility promptly, or from negligence</td><td>Not eligible</td></tr></tbody></table>
Documentation
  • Small projects: you certify instead of providing documents: for debris, that it was generated by the incident during the incident period and its removal addresses an immediate threat; for emergency protective measures, that the threat resulted from the incident; for permanent work, that the incident directly caused the damage and it did not result from lack of maintenance.
  • Large projects: if needed to validate the cause, pre-incident photos or video of the site, and records of its pre-disaster condition such as maintenance records or inspection and safety reports.
  • Not every large project needs these. When the cause is evident at inspection, for example a bridge washed away or a building destroyed by fire, FEMA does not require them.
  • Some project types, such as maintained natural features and beaches, always require maintenance records or photos.
Watch out · Govstar advice
Deferred maintenance is one of the most common ways FEMA cuts permanent work. Pull maintenance logs, inspection reports and pre-disaster photos early, before FEMA asks, especially for roads, culverts and natural features.
PAPPG v5.0 pp. 62–65 · 44 CFR 206.223(a), (e)
Read this in the PAPPG
Chapter 4 › II.A Emergency Work vs. Permanent Work

What’s the difference between emergency work and permanent work, and what are the categories?

Emergency work vs. permanent work; categories of work
p. 62
Short answer
Emergency work addresses an immediate threat: debris removal (Category A) and emergency protective measures (Category B). Permanent work restores damaged facilities (Categories C–G), including cost-effective hazard mitigation, plus building code and floodplain management administration and enforcement (Category I).
What FEMA requires
  • FEMA funds debris removal and emergency protective measures (emergency work), and permanent restoration of damaged facilities, including cost-effective hazard mitigation, and building code and floodplain management administration and enforcement (permanent work).
  • Emergency work addresses an immediate threat. Permanent work restores a damaged facility, or covers code and floodplain administration and enforcement.
  • If you do not comply with all applicable statutes, executive orders, regulations and policies, FEMA may disallow all or part of the cost of the noncompliant project.
<table class="pt-table"><thead><tr><th>Category</th><th>Type of work</th><th>Covers</th></tr></thead><tbody><tr><td>A</td><td>Emergency work</td><td>Debris removal</td></tr><tr><td>B</td><td>Emergency work</td><td>Emergency protective measures</td></tr><tr><td>C</td><td>Permanent work</td><td>Roads and bridges</td></tr><tr><td>D</td><td>Permanent work</td><td>Water control facilities</td></tr><tr><td>E</td><td>Permanent work</td><td>Buildings and equipment</td></tr><tr><td>F</td><td>Permanent work</td><td>Utilities</td></tr><tr><td>G</td><td>Permanent work</td><td>Parks, recreational and other facilities</td></tr><tr><td>I</td><td>Permanent work</td><td>Building code and floodplain management administration and enforcement</td></tr></tbody></table>
Documentation

Keep emergency and permanent work costs in separate records from the start. FEMA assigns the categories when it groups your impacts into projects, and the deadlines and documentation differ between them.

Watch out · Govstar advice
Mixing emergency and permanent work in the same records causes trouble later. Temporary repairs to stop further damage are usually emergency work; restoring the facility is permanent work, with a different deadline.
PAPPG v5.0 p. 62 · 2 CFR 200.339
Read this in the PAPPG
Chapter 4 › I.C Facility Scheduled for Repair or Replacement

Is a facility eligible if we had already planned to repair or replace it?

Facility scheduled for repair or replacement
pp. 61–62
Short answer
Yes, if the work was not yet under contract and was to be paid for with non-federal funds, as long as the damage you claim did not exist before the incident. If some damage already existed, FEMA funds only the repair of damage the incident caused.
What FEMA requires
  • The facility must not yet be under contract for the repair or replacement.
  • The planned work must have been scheduled with non-federal funds.
  • The damage claimed must not have existed before the incident. FEMA reviews procurement and contract documents to check this.
  • Where damage existed before the incident, only the repair of incident-caused damage is eligible.
Documentation

The budget, capital plan or schedule showing the planned work and its non-federal funding source; procurement and contract documents; and any condition assessments describing the facility before the incident.

Watch out · Govstar advice
Capital plans and condition assessments that describe a facility as failing can be used to argue the damage existed before the disaster. In your damage description, separate pre-existing deficiencies from disaster damage clearly.
PAPPG v5.0 pp. 61–62
Read this in the PAPPG
Chapter 4 › I.B Inactive or Partially Inactive Facility

Is a facility eligible if it wasn’t fully in use when the disaster hit?

Inactive or partially inactive facility
p. 61
Short answer
Generally no. A facility must be in active use when the incident period starts. The exceptions: it was only temporarily closed for repairs or remodeling, its future use was set in an approved budget or plan, or you can clearly show you intended to put it back in use soon. A facility that was only partly in use is funded in proportion to the share that was active.
What FEMA requires
  • Inactive or partially inactive facilities are ineligible unless one of three conditions is met: it was temporarily inactive for repairs or remodeling (as long as a contractor is not responsible for repairing the disaster damage); future active use was established in an approved budget or plans; or you can clearly show intent to begin use within a reasonable time.
  • Inactive portions of a partly occupied facility are ineligible unless one of those conditions applies.
  • The facility must have been eligible while it was in use.
  • Repairs that also benefit an inactive area are prorated by the percentage of the facility in active use. If the roof of a partly used building is destroyed, FEMA pays only that share of the replacement cost.
  • A private nonprofit mixed-use facility is eligible only if more than 50 percent of it was in active use for an eligible purpose at the time of the incident.
Documentation

Evidence the facility was in active use when the incident period began, such as occupancy, operating or utility records. For an exception: the repair or remodeling contract, the approved budget or plan for future use, or documents showing your intent to resume use soon. For partly used facilities, records of the share of space in active use.

Watch out · Govstar advice
Vacant or mothballed buildings are a common denial. If part of a building was empty, expect FEMA to prorate shared repairs such as roofs. Document the occupied square footage yourself before FEMA estimates it for you.
PAPPG v5.0 p. 61 · 44 CFR 206.226(k)(2)
Read this in the PAPPG
Chapter 4 › I.A Public Facility

What counts as an eligible public facility?

Public facility; improved and maintained natural features
pp. 60–61
Short answer
A facility that a state, local, tribal or territorial government owns or is legally responsible for maintaining. That includes systems such as water, sewer, power and flood control; buildings; non-federal-aid roads; airports; parks; and smaller assets such as signs, fences, lighting, equipment and vehicles. A natural feature qualifies only where it has been improved and is regularly maintained.
What FEMA requires
  • In general, the facility must be eligible before the work can be. Some emergency protective measures are the exception (see Chapter 7).
  • Eligible facility types include systems (flood control, navigation, irrigation, reclamation, public power, sewage, water supply, watershed development); buildings, including sheds, restrooms and outbuildings; non-federal-aid streets, roads, ramps and access roads; public buildings and structures, including educational, recreational and cultural ones; airports and runways; parks, piers, trails, pools, golf courses and ball fields; and other assets such as pumping stations, towers, contents, equipment, vehicles, parking lots, sidewalks, ditches, guard rails and catch basins.
  • A natural feature is eligible only if it has a designed and constructed improvement, the improvement enhances its function, and you maintain it on a regular schedule. Only the improved section qualifies: if 150 feet of a channel bank is armored and maintained, only those 150 feet are eligible.
  • Unimproved property (hillsides, forests, natural channel banks) and land used for agriculture are ineligible.
  • A facility run by a community development district is ineligible if it is not open to, or does not serve, the general public.
Documentation

Records showing you own the facility or are legally responsible for maintaining it. For an improved natural feature, the design or construction records for the improvement and maintenance records showing it was maintained on a regular schedule.

Watch out · Govstar advice
For improved natural features such as armored channel banks or terraced slopes, FEMA funds only the improved and maintained section. Without a maintenance schedule and records showing it was followed, expect the claim to be denied.
PAPPG v5.0 pp. 60–61 · Stafford Act § 102(10) · 44 CFR 206.221(h)
Read this in the PAPPG
Govstar summarizes FEMA’s Public Assistance Program and Policy Guide, version 5.0 Amended, for disasters declared on or after January 6, 2025. “Watch out” notes are Govstar practitioner advice, not FEMA policy. Govstar is independent and not affiliated with FEMA. This is general guidance, not legal advice.