PAPPG v5.0 · Chapter 6 · pages 75–114

Cost Eligibility

The rules for what FEMA will reimburse on any project, emergency or permanent: your employees’ time and overtime, your own and rented equipment, supplies, contracts and procurement, mutual aid and donated resources, management costs, and the insurance and other funding FEMA subtracts. Every section is written as the question applicants actually ask, with FEMA’s requirements, the records you need, and the exact PAPPG pages.

32 topicsApplies to every category of workProcurement: 2 CFR Part 200No records, no reimbursement
Jump to a part of the chapter
Chapter 6 › XXIII. Ineligible Costs

Will FEMA cover lost revenue or higher operating costs?

Ineligible costs
pp. 113–114
Short answer
No. The Stafford Act funds specific work, not every loss. Lost revenue, lost useful service life, post-disaster tax assessments and increased operating costs are generally ineligible.
What FEMA requires
  • Lost revenue: for example, waived tolls, ferry fares or tipping fees, cancelled events, utility shutdowns, or hospitals releasing patients or losing capacity.
  • Loss of useful service life: for example, long-term effects of flooding on a road, or lost landfill capacity from disaster debris.
  • Tax assessments: re-assessing property values after the disaster.
  • Increased operating costs: higher costs from increased demand for a service are generally ineligible. Short-term costs directly tied to specific emergency health and safety tasks can be eligible as emergency protective measures, such as fuel for increased pumping station use.
Documentation

For any increased operating cost you claim as emergency work, records tying it to the specific health and safety task and the period it lasted.

Watch out · Govstar advice
Local governments with a substantial loss of tax and other revenue may qualify for a Community Disaster Loan under Stafford Act Section 417, a separate program from PA.
PAPPG v5.0 pp. 113–114
Read this in the PAPPG
Chapter 6 › XX.B–XXI Duplication of Benefits and Funding

Do other grants, donations or lawsuit recoveries reduce our FEMA funding?

Duplication of benefits (non-insurance)
pp. 112–113
Short answer
It depends on what the money was for. Funds for the same purpose as FEMA-eligible work must go to your cost share or FEMA reduces funding. Unrestricted donations don’t duplicate. Funds from another federal agency for the same purpose always do.
What FEMA requires

A third party is a private entity or individual outside the federal award whose actions caused damage or increased costs.

<table class="pt-table"><thead><tr><th>Source of funds</th><th>FEMA treatment</th></tr></thead><tbody><tr><td>Non-federal grant or cash donation for the same purpose as eligible work</td><td>Use toward your non-federal share; otherwise, or for any excess, FEMA reduces eligible costs</td></tr><tr><td>Non-federal grant or donation for non-specific purposes</td><td>Not a duplication; may go to your share, and any excess to ineligible work</td></tr><tr><td>Non-federal grant or donation for an ineligible purpose</td><td>Can&rsquo;t be applied to your non-federal share</td></tr><tr><td>Third-party liability recovery</td><td>Pursue in good faith; FEMA reduces by the amount recovered for eligible losses</td></tr><tr><td>Another federal agency&rsquo;s funds for the same purpose</td><td>A duplication; FEMA cannot fund it</td></tr><tr><td>Other FEMA programs (Individual Assistance, HMGP)</td><td>You must certify no work or cost is covered by another source</td></tr></tbody></table>
Documentation

Grant agreements and donor letters showing each fund’s purpose, settlement documents for third-party recoveries, and your certification of no duplicate funding.

Watch out · Govstar advice
Ask donors to state the purpose in writing. An unrestricted gift helps your cost share; a gift earmarked for eligible repairs may simply reduce FEMA’s share.
PAPPG v5.0 pp. 112–113 · Stafford Act § 312 · 2 CFR 200.406
Read this in the PAPPG
Chapter 6 › XX.A Insurance Proceeds

How does insurance affect our FEMA funding?

Insurance reductions; duplication of benefits
pp. 110–112
Short answer
FEMA cannot duplicate insurance. It reduces eligible costs by actual insurance proceeds, or by anticipated proceeds under your policy until the claim settles, then adjusts. You must make reasonable efforts to pursue the claim.
What FEMA requires
  • FEMA limits funding if your policy provides coverage you should pursue.
  • Reasonable costs of pursuing a larger settlement can offset the reduction, if tied to FEMA-eligible work and documented as winning more than the first offer.
  • If proceeds cover both eligible and ineligible losses, such as business interruption, FEMA apportions them by settlement allocation, policy limits or the ratio of eligible to ineligible losses.
Documentation
  • Policies: property, auto, flood, wind, and self-insurance or self-insured retention.
  • Policy documents: declaration pages, schedule of covered locations, forms and endorsements, inland marine and equipment breakdown sections.
  • Settlement records, as soon as available: final statement of loss, adjuster estimates, settlement checks, correspondence on allocation, and any denial letter.

Source: PAPPG Table 19. See also FEMA Recovery Policy FP 206-086-1.

Watch out · Govstar advice
Get the insurer’s allocation of the settlement in writing. Without it, FEMA applies its own formula, often to your disadvantage.
PAPPG v5.0 pp. 110–112 · Stafford Act § 312 · 44 CFR 206.252–206.253
Read this in the PAPPG
Chapter 6 › XIX. Surveys to Assess or Locate Damage or Debris Impacts

Can we claim the cost of finding and inspecting disaster damage?

Surveys to assess or locate damage or debris impacts
p. 110
Short answer
Surveying overall impacts and locating damage are not project costs, but can be claimed as management costs. Detailed inspections to determine the extent of damage and how to repair it are part of the project.
What FEMA requires
  • Assessing overall impacts, locating damage or debris, and preliminary damage assessments: eligible only as management costs.
  • Inspecting a facility where damage was found during a post-declaration survey: eligible as management costs if the facility is eligible.
  • Detailed inspections and professional evaluations to determine extent of damage, debris quantities and repair method: eligible as project costs.
  • For partially damaged systems, eligible inspection cost is proportional: inspect 500 feet of sewer and find 100 feet damaged, and one-fifth of the cost is eligible.
Documentation

Inspection reports, the length or area inspected versus damaged, and time and cost records.

Watch out · Govstar advice
Scope system-wide inspections (sewer, storm drains) carefully. FEMA pays only the damaged share, so a broad inspection can cost you more than it recovers.
PAPPG v5.0 p. 110
Read this in the PAPPG
Chapter 6 › XVIII. Grant Management and Administration

Will FEMA pay for the cost of managing our FEMA grant?

Category Z: Management costs
pp. 109–110
Short answer
Yes, as management costs: actual costs up to 5 percent of a subrecipient’s total award, and up to 7 percent of the total award for recipients. They cover indirect and direct administrative costs of developing and managing eligible PA projects.
What FEMA requires
  • Costs must be associated with eligible facilities, work and costs.
  • Costs to survey overall impacts, locate damage or conduct preliminary damage assessments are management costs, not project costs.
Documentation

A summary of work and costs: number of employees, equipment used with rates, total labor and equipment hours (or miles), total costs, and a general description of tasks performed. FEMA may ask for more.

Watch out · Govstar advice
Track grant administration time from day one under its own charge code. It is the easiest cost to lose because nobody records it.
PAPPG v5.0 pp. 109–110 · FEMA Recovery Policy FP 104-11-2
Read this in the PAPPG
Chapter 6 › XVII. Project Management and Design Services

Will FEMA pay for project management, engineering and design?

Project management and design services
p. 109
Short answer
Yes, as part of the project, when tracked, documented and tied to a specific eligible project. Project management is different from management costs, which cover administering the FEMA grant itself.
What FEMA requires
  • Eligible project management includes procurement actions, legal review of contracts, monitoring contractors, construction oversight and inspections, environmental and historic studies, permits, and debris load tickets.
  • Architectural, engineering and design services for the approved scope, including hazard mitigation, are eligible if reasonable.
  • Management and design costs for ineligible improvements are not eligible, including added design for improved projects.
Documentation

Time and cost records that tie each project management or design activity to a specific project.

Watch out · Govstar advice
Keep project management and grant management on separate charge codes. Mixing them makes both harder to support.
PAPPG v5.0 p. 109
Read this in the PAPPG
Chapter 6 › XVI. Donated Resources

Can volunteers and donated supplies count toward our cost share?

Donated resources; non-federal cost share offset
pp. 105–108
Short answer
FEMA doesn’t pay for donations, but their value can offset your non-federal cost share. For debris and emergency protective measures, the offset applies across all those projects; for permanent work, only to the project the donation supported.
What FEMA requires
  • The donation came from a third party, including your own employees volunteering unpaid and not on your behalf;
  • It was necessary and reasonable;
  • It was used for eligible work within the project’s period of performance; and
  • You tracked the resources and work, with descriptions, locations and hours.

Donations from federal agencies or federally funded sources, used as an offset on another federal award, or used for ineligible work don’t count. Don’t solicit donations from contractors bidding on your work, or favor contractors who donate.

<table class="pt-table"><thead><tr><th>Donation</th><th>How the offset is valued</th></tr></thead><tbody><tr><td>Volunteer labor</td><td>Straight-time rate plus fringe of a similarly qualified employee; no overtime or premium rates</td></tr><tr><td>Equipment</td><td>Equipment rates, capped at fair rental or fair market value</td></tr><tr><td>Supplies or materials</td><td>Current commercial rates, capped at fair market value</td></tr><tr><td>Buildings or land (permanent)</td><td>Fair market value by independent appraisal</td></tr><tr><td>Space (temporary)</td><td>Fair rental value of comparable private space</td></tr><tr><td>Logistical support</td><td>May be eligible, subject to FEMA approval</td></tr></tbody></table>
Documentation

Sign-in sheets with each volunteer’s name, function, dates, hours, location and work; donor, equipment details, sites and hours for equipment; donor, description, quantity, location and value support for supplies. Source: PAPPG Table 18.

Watch out · Govstar advice
The offset is capped at your non-federal share and your out-of-pocket costs. Track volunteers daily from the start; reconstructed sign-in sheets are hard to defend.
PAPPG v5.0 pp. 105–108 · 2 CFR 200.306
Read this in the PAPPG
Chapter 6 › XV. Increased Federal Cost Share for a Limited Timeframe

How does a temporary 100 percent federal cost share work?

Increased federal cost share for a limited timeframe
p. 105
Short answer
When the President authorizes a higher federal share for a limited time, FEMA applies it to eligible work performed through 11:59 p.m. local time on the expiration date. You must separate costs before and after the deadline.
What FEMA requires
  • Employees: hours worked up to the expiration.
  • Purchased materials and equipment: items needed and used during the period, plus usage up to the expiration.
  • Leased equipment and facilities: prorated by time up to the expiration.
  • Contracts: work performed up to the expiration; if dates can’t be separated, FEMA prorates by percentage of work completed.
Documentation

Timesheets, equipment logs, leases and contractor invoices that show dates of work relative to the deadline.

Watch out · Govstar advice
Ask contractors to invoice separately for work before and after the deadline. Prorating by percentage complete usually costs you money.
PAPPG v5.0 p. 105
Read this in the PAPPG
Chapter 6 › XII–XIII. Prisoners and National Guard

Can we claim costs for prison work crews or National Guard support?

Prisoner labor; National Guard State Active Duty
p. 104
Short answer
Prison labor is eligible at the rate you normally pay prisoners, plus transport and extraordinary security, food and lodging. National Guard on State Active Duty is eligible for regular time, overtime, benefits and per diem; Guard under federal (Title 32 or Title 10) status is not.
What FEMA requires
  • Prisoners: pay at your normal prisoner rate; transportation to and from the worksite and extraordinary security, food and lodging costs are eligible.
  • National Guard on State Active Duty performing eligible work: straight time, overtime, fringe and per diem are eligible.
  • Title 32 and Title 10 personnel and other Department of Defense-funded costs are ineligible.
Documentation

For prison labor on large projects: the prison’s labor policy, names, locations, dates, hours, pay rate and daily activity logs. Source: PAPPG Table 17.

Watch out · Govstar advice
Confirm the Guard activation order says State Active Duty. A change to Title 32 status mid-incident changes who pays.
PAPPG v5.0 p. 104 · Stafford Act § 406(a)(2)(B)
Read this in the PAPPG
Chapter 6 › XI. Mutual Aid

Will FEMA pay for help we got from other agencies or jurisdictions?

Mutual aid; requesting and assisting entities
pp. 100–103
Short answer
Yes, when you requested it. FEMA pays the requesting entity, which is legally responsible for the work, not the agency that helped. Mutual aid is eligible for emergency protective measures, emergency utility restoration, building code and floodplain work, and grant management.
What FEMA requires
  • The assisting entity’s labor is treated as contract labor: regular time, overtime and certain benefits, at reasonable rates. If both entities are divisions of the same government, budgeted regular time is ineligible.
  • Travel to the declared area is eligible. Preparing to deploy, dispatch outside the receiving state, training, and long-term recovery support are not.
  • Backfill for deployed personnel: overtime only.
  • Equipment is paid under the agreement’s terms or equipment rates.
  • No written agreement? A verbal agreement works, but it must be put in writing and adopted by both entities before funding, consistent with past practice.
  • Some states reimburse assisting entities directly under a statewide agreement; FEMA then funds the state.
  • EMAC work follows EMAC rules, and FEMA does not do a reasonable cost analysis on it.
Documentation
  • Non-EMAC, small projects: services requested and received, total cost, and proof of payment at closeout.
  • Non-EMAC, large projects: the written agreement, services requested and received, dates, entity names, work descriptions and costs, labor, equipment and supply records, and invoices.
  • EMAC: the signed Resource Support Agreement at obligation; R-1 and R-2 reimbursement forms and proof of payment at closeout.

Source: PAPPG Table 16.

Watch out · Govstar advice
If you don’t normally pay mutual aid partners, don’t agree to pay them just because FEMA might reimburse it. FEMA checks consistency with past practice.
PAPPG v5.0 pp. 100–103
Read this in the PAPPG
Chapter 6 › X.E Required Documentation and Information for Procurement and Contracting

What contract records do we need to give FEMA?

Required documentation for contract costs
p. 100
Short answer
Small projects need an itemized summary by contractor. Large projects need the full procurement file plus invoices, and time-and-materials contracts need proof of close oversight.
What FEMA requires

All small projects must still comply with procurement rules, and FEMA reviews any small project using noncompetitive, time-and-materials or cost-plus-percentage contracts.

Documentation
  • Small projects: procurement method (competitive or noncompetitive), contract type, and total contract award for each contractor.
  • Large projects: contractor name, dates worked, invoice numbers, amounts and description of work; requests for proposals, bids, selection process, procurement policy, cost or price analysis, contracts and change orders, and invoices; and, for time-and-materials contracts, daily or weekly logs or performance meeting records.

Source: PAPPG Table 15.

Watch out · Govstar advice
Build the procurement file as you go. Selection memos and price analyses written after FEMA asks for them rarely hold up.
PAPPG v5.0 p. 100
Read this in the PAPPG
Chapter 6 › X.D.2 Additional Contracting Considerations

Can we use standby contracts, cooperative purchasing or another agency’s contract?

Pre-positioned contracts; cooperative purchasing; piggyback contracts
p. 99
Short answer
Pre-positioned (standby) contracts work if they were competed under federal rules and cover the work performed. FEMA advises against cooperative purchasing and piggyback contracts because they often fail federal procurement requirements.
What FEMA requires

FEMA reimburses reasonable costs under a pre-positioned contract if:

  • It was originally procured in compliance with federal requirements;
  • Its scope of work covers the work performed;
  • The work was eligible; and
  • The contract term covers when the work was done.

If you use a cooperative purchasing program, you must document how its use complied with all procurement requirements. Joint procurements, where two or more entities run one solicitation together, see fewer compliance problems.

Documentation

The original solicitation and award for any pre-positioned contract, and a written compliance analysis for any cooperative purchase.

Watch out · Govstar advice
A piggyback contract was competed for someone else’s needs, so its scope rarely matches yours. Compete your own pre-positioned contracts before disaster season.
PAPPG v5.0 p. 99
Read this in the PAPPG
Chapter 6 › X.C.1–X.D Contract Types and Time-and-Materials Contracts

Which contract types will FEMA pay for?

Fixed price, cost-reimbursement, time-and-materials; cost-plus-percentage-of-cost
pp. 98–99
Short answer
FEMA reimburses fixed-price and cost-reimbursement contracts, and time-and-materials contracts only in limited cases. Cost-plus-percentage-of-cost and percentage-of-construction pricing is prohibited.
What FEMA requires

You must oversee every contract to make sure the contractor performs to its terms. Time-and-materials (and time-and-equipment) contracts are used only for a reasonable period until you can define the scope of work.

<table class="pt-table"><thead><tr><th>Contract type</th><th>FEMA treatment</th></tr></thead><tbody><tr><td>Fixed price</td><td>Eligible</td></tr><tr><td>Cost-reimbursement</td><td>Eligible</td></tr><tr><td>Time-and-materials</td><td>Allowed only if no other type was suitable, the contract has a ceiling price the contractor exceeds at its own risk, and you maintain a high degree of oversight</td></tr><tr><td>Cost-plus-percentage-of-cost or percentage-of-construction</td><td>Prohibited; FEMA does not pay the percentage markup</td></tr></tbody></table>
Documentation

For time-and-materials contracts, daily or weekly logs or records of performance meetings showing oversight. Source: PAPPG Table 15.

Watch out · Govstar advice
Convert time-and-materials work to a fixed-price or unit-price contract as soon as the scope is clear. The longer it runs, the harder it is to defend.
PAPPG v5.0 pp. 98–99 · 2 CFR 200.318(j), 200.324(c)
Read this in the PAPPG
Chapter 6 › X.C Noncompetitive Procurement

Can we hire a contractor without competitive bidding in an emergency?

Noncompetitive procurement; exigency or emergency
pp. 96–97
Short answer
Yes, but only under one of four circumstances, only for work tied to that circumstance, and only while it lasts. Start a competitive procurement right away and move to a competed contract as soon as the emergency or exigency ends.
What FEMA requires

A sole-source contract is allowed only when:

  • The item is available from only one source;
  • A public exigency or emergency won’t permit the delay of competition;
  • FEMA or the recipient authorizes it in writing at your request; or
  • Competition proved inadequate after soliciting several sources.

For large projects, document which circumstance applied, a description and expected amount, why competition wasn’t possible, how long the contract will be used, the steps you took to try to compete, and any conflicts of interest. Failing to plan the transition is not a reason to keep using a sole-source contract.

Documentation

A written justification covering each of the points above, prepared when the decision was made.

Watch out · Govstar advice
Emergency (immediate threats, such as clearing roads for rescue) and exigency (urgent but not life-threatening, such as reopening a school by September) are different. Name the one that applies and set an end date.
PAPPG v5.0 pp. 96–97 · 2 CFR 200.320(f), 200.339
Read this in the PAPPG
Chapter 6 › X.A Procurement and Contracting Requirements for State and Territorial Government and Tribal Nation Entities

What procurement rules apply to state, tribal and territorial governments?

2 CFR 200.317 procurement by states
pp. 92–93
Short answer
States, territories and tribes follow the same procurement policies they use with their own funds, plus the EPA recovered-materials rule, and must include the required federal contract clauses in every contract.
What FEMA requires
  • Follow your own policies and procedures for non-federal procurements, and 2 CFR 200.322 on recovered materials.
  • FEMA may review your procurement rules or ask your attorney to certify in writing that you followed them.
  • Include the required provisions of 2 CFR 200.327 in all contracts: remedies; termination for cause and convenience; equal employment opportunity; Contract Work Hours and Safety Standards Act; Clean Air Act and Clean Water Act; debarment and suspension; Byrd anti-lobbying clause and certification; recovered materials; covered telecommunications; and domestic preference.
Documentation

Your procurement procedures or an attorney certification, and contracts showing the required clauses. FEMA’s Contract Provisions Guide gives the exact wording where verbatim language is required.

Watch out · Govstar advice
Even where state law allows them, time-and-materials contracts without a ceiling and cost-plus-percentage contracts carry a high risk that FEMA will find the costs unreasonable.
PAPPG v5.0 pp. 92–93 · 2 CFR 200.317, 200.322, 200.327
Read this in the PAPPG
Chapter 6 › X.B Procurement and Contracting Requirements for Local Government Agencies and Private Nonprofit Organizations

What procurement rules do local governments and nonprofits have to follow?

Federal procurement standards (2 CFR 200.318–200.327)
pp. 91–96
Short answer
You must follow your own written procurement procedures, your state and local laws, and the federal rules in 2 CFR 200.318–200.327, using whichever is most restrictive. If you don’t comply, FEMA can deny all contract costs or pay only the portion it finds reasonable.
What FEMA requires
  • Full and open competition, using one of five methods: micro-purchase, small purchase, sealed bid, competitive proposal, or noncompetitive proposal.
  • A cost or price analysis for every procurement above the simplified acquisition threshold ($250,000 at publication), including modifications, with an independent estimate before receiving bids.
  • Steps to include small, minority, women-owned and veteran-owned businesses and labor surplus area firms.
  • Documented review of the contractor’s integrity, past performance and resources, and confirmation that it is not suspended or debarred.
  • Exclusion of contractors that helped write the specifications.
  • Records of the procurement history: method, contract type, selection or rejection, and the basis for the price.
  • Written standards of conduct covering conflicts of interest.
Documentation

Your procurement policy, solicitations, bids, selection documentation, cost or price analysis, contracts, change orders and invoices. Source: PAPPG Table 15.

Watch out · Govstar advice
A prequalified contractor list is not a contract. You still have to compete the work, and you can’t exclude firms that weren’t on the list.
PAPPG v5.0 pp. 91–96 · 2 CFR 200.317–200.327, 200.339
Read this in the PAPPG
Chapter 6 › VII–IX. Disposition

What happens to equipment and supplies we bought with FEMA funds once the disaster is over?

Disposition
pp. 89–91
Short answer
When FEMA-funded equipment or supplies are no longer needed, you may owe FEMA its share of what is left if the value is $10,000 or more. Local governments and nonprofits can first move equipment to other federally funded programs if they tell FEMA.
What FEMA requires

Equipment is property with a useful life over one year and a unit cost at or above the lesser of your capitalization level or $10,000. Everything else is a supply. Small projects handle fair market value during project formulation, with no reduction for supplies.

<table class="pt-table"><thead><tr><th>Item</th><th>Who</th><th>Rule</th></tr></thead><tbody><tr><td>Equipment</td><td>States, territories, tribes</td><td>Follow your own laws and procedures (tribes without them follow 2 CFR 200.313(c)–(e))</td></tr><tr><td>Equipment</td><td>Local governments, nonprofits</td><td>Calculate current fair market value per item; if $10,000 or more, FEMA reduces funding by its cost share</td></tr><tr><td>Supplies</td><td>All applicants</td><td>Total unused residual supplies; if over $10,000, FEMA reduces funding by its cost share</td></tr><tr><td>Real property</td><td>All applicants</td><td>Get disposition instructions from FEMA</td></tr></tbody></table>
Documentation

An inventory of FEMA-funded equipment and supplies, with fair market value calculations when they are no longer needed.

Watch out · Govstar advice
Equipment examples include ventilators, hospital beds and refrigerated trucks; laptops, iPads and PPE are supplies. Classify items correctly when you buy them.
PAPPG v5.0 pp. 89–91 · 2 CFR 200.1, 200.311, 200.313, 200.314
Read this in the PAPPG
Chapter 6 › VI. Supplies

Will FEMA pay for supplies and materials we bought or took from stock?

Supplies (materials)
pp. 88–89
Short answer
Yes, if you bought them because they were justifiably needed for the response or recovery, or took them from your own stock and used them for the incident. FEMA pays based on invoices, or on your normal method of pricing inventory for items taken from stock.
What FEMA requires
  • Track items taken from stock with inventory withdrawal and usage records.
  • Without invoices, FEMA uses your established inventory pricing method; without one, historical data or area vendor prices.
Documentation
  • Small projects: type, quantity and total cost.
  • Large projects: for stock items, original invoices or cost records, inventory records, quantities used and location; for purchases, receipts or invoices, quantities used, and a justification for anything not used.

Source: PAPPG Table 14.

Watch out · Govstar advice
Bulk purchases that go unused need a written justification. Buy what the response needs, and log withdrawals from stock as they happen.
PAPPG v5.0 pp. 88–89 · 2 CFR 200.453(b)
Read this in the PAPPG
Chapter 6 › II. Reasonable Costs

How does FEMA decide whether our costs were reasonable?

Reasonable cost; reasonable cost analysis
pp. 75–78
Short answer
A cost is reasonable if a prudent person would have paid it under the circumstances at the time. FEMA analyzes reasonableness for contract work bought without competition, time-and-materials or cost-plus-percentage contracts, and noncompliant procurements on large projects. For your own staff and equipment, it reviews only large projects.
What FEMA requires

FEMA weighs whether:

  • The cost is ordinary and necessary for the type of facility or work, with the right skill level and level of effort;
  • The hours claimed fit the severity of the incident, the need for extraordinary hours, the employee’s function and consecutive hours worked;
  • You used sound business practices and arm’s-length bargaining;
  • You acted with prudence, and followed your own established practices and policies;
  • You complied with procurement rules, including a cost or price analysis and selecting the lowest responsible bidder under your criteria; and
  • The cost matches current market prices in the area, based on your history, average area costs, other applicants’ costs, published cost data or FEMA cost codes.

FEMA also considers shortages, project complexity, economy of scale, extraordinary labor needs and your written justification. If a cost is not reasonable, FEMA may fund only the reasonable portion, using the least-cost alternative, the lowest bid, another applicant’s properly procured price or a FEMA estimate.

Documentation

Bid tabulations, your cost or price analysis, historical invoices for similar work, and a written justification for any cost above market, prepared at the time.

Watch out · Govstar advice
Write down why prices were high while it is happening: shortages, haul distances, access problems. A justification reconstructed months later carries far less weight.
PAPPG v5.0 pp. 75–78 · 2 CFR 200.403, 200.404, 200.339
Read this in the PAPPG
Chapter 6 › I. Eligibility Requirements

What makes a disaster cost eligible for FEMA reimbursement?

Cost eligibility
p. 75
Short answer
Not every cost caused by the disaster is eligible. FEMA looks at cost last, after the applicant, facility and work are found eligible, and every cost must pass six tests. You must also keep all records for three years after the final expenditure is documented.
What FEMA requires

To be eligible, a cost must be:

  • Directly tied to the performance of eligible work;
  • Adequately documented, substantiated or certified;
  • Reduced by all applicable credits, such as insurance proceeds and salvage values;
  • Authorized and not prohibited under federal, state, local, tribal or territorial law;
  • Consistent with your internal policies that apply uniformly to federal awards and your other activities; and
  • Necessary and reasonable to accomplish the work properly and efficiently.
Documentation

Keep cost, financial, procurement, property, equipment and program records for three years from the date the final expenditure is documented. If litigation, an audit or another claim starts before then, keep them until it is resolved.

Watch out · Govstar advice
Records retention runs from the final expenditure, not the disaster date. Large projects can stay open for years, so set retention by project, not by incident.
PAPPG v5.0 p. 75 · 2 CFR 200.403, 200.406 · Stafford Act § 312
Read this in the PAPPG
Chapter 6 › V. Rented or Leased Equipment

We rented equipment for the disaster. Will FEMA pay the rental cost?

Rented or leased equipment
p. 87
Short answer
Yes, based on the terms of the rental agreement, provided you compared renting with buying and the rental didn’t cost more than buying and maintaining the equipment over the project.
What FEMA requires
  • An analysis of renting or leasing versus purchasing.
  • Total rental cost no higher than purchase and maintenance over the life of the project. If it is higher, FEMA judges whether you acted prudently given the circumstances at the time.
  • Rent-to-own: if you gain ownership during the work, FEMA switches to the hourly equipment rate; if the work ends first, FEMA pays the rental cost.
Documentation

The rental or lease agreement, invoices, and the rent-versus-buy comparison.

Watch out · Govstar advice
Write the rent-versus-buy comparison at the time you rent, even briefly. It is a federal procurement requirement, not just a FEMA preference.
PAPPG v5.0 p. 87 · 2 CFR 200.318(d)
Read this in the PAPPG
Chapter 6 › IV.A–D Equipment Rates

Which hourly rate will FEMA use for our equipment?

FEMA, state, tribal, territorial and local equipment rates
pp. 85–86
Short answer
FEMA uses either its national Schedule of Equipment Rates or your government’s own rates, depending on which applies and which is lower. FEMA’s rates already include fuel and maintenance, so those can’t be claimed on top.
What FEMA requires

If comparing rates item by item is too burdensome, you can ask FEMA to reimburse all equipment at whichever whole schedule is lower.

<table class="pt-table"><thead><tr><th>Rate type</th><th>How FEMA applies it</th></tr></thead><tbody><tr><td>FEMA rates</td><td>Cover ownership and operating costs except operator labor, including fuel and maintenance. Mechanic labor and fuel can’t be claimed separately.</td></tr><tr><td>State, tribal or territorial rates</td><td>Paid up to $75 per hour; above that only if each rate component is shown to match current market prices.</td></tr><tr><td>Local rates</td><td>Generally the lower of the local or FEMA rate. FEMA may pay the higher FEMA rate if you certify your local rate doesn’t reflect all actual costs. A higher local rate needs documented support and FEMA approval.</td></tr><tr><td>No established rate</td><td>FEMA rate applies. If FEMA has none, submit a rate with market-price support or ask FEMA to set one. Rental rates can’t be used as the basis.</td></tr></tbody></table>
Documentation

Your rate schedule and its basis, or the FEMA equipment code for each item.

Watch out · Govstar advice
Claiming fuel or mechanic time in addition to FEMA rates is double counting.
PAPPG v5.0 pp. 85–86 · 44 CFR 206.228(a)(1)(i)–(iii)
Read this in the PAPPG
Chapter 6 › IV. Applicant-Owned and Purchased Equipment

How does FEMA pay for our own trucks and machinery, or equipment we had to buy?

Force account equipment
pp. 84–85
Short answer
FEMA pays an hourly rate for the time your equipment is actually operating on eligible work, including permanently mounted generators. Vehicles can be paid by documented mileage if that costs less. If you had to buy equipment to respond, FEMA can fund the purchase plus either the hourly rate or actual fuel and maintenance.
What FEMA requires
  • Rates apply only to operating time. Transporting equipment to an eligible site is eligible.
  • Standby time is not eligible, unless the operator used the equipment intermittently for more than half of the working hours that day.
  • Purchased equipment must have been justifiably needed, and disposition rules apply when you are done with it.
Documentation
  • Small projects: an itemized summary by equipment type with total usage hours and total cost; for purchases, total cost.
  • Large projects: equipment type and attachments (year, make, model, size, capacity, horsepower or wattage), sites used, FEMA equipment code or your rate schedule, and the operator’s name with date and hours each day; for purchases, invoices or receipts.

Source: PAPPG Table 12.

Watch out · Govstar advice
Log equipment hours daily alongside the operator’s timesheet. Reconstructing logs later is the most common gap.
PAPPG v5.0 pp. 84–85 · 44 CFR 206.228(a)(1)
Read this in the PAPPG
Chapter 6 › III.B.7 Standby Time

Will FEMA pay for crews waiting on call during the disaster?

Standby time
pp. 83–84
Short answer
Only for life-saving work. FEMA covers intermittent standby time for staff conducting evacuation or sheltering, search and rescue, or emergency medical care, when all of its criteria are met.
What FEMA requires
  • Standby use and pay follow your labor policy and your practice in non-federal incidents, or a contract or union agreement requires it;
  • Standby was needed to keep resources ready for the life-saving action;
  • The number of people and hours was reasonable for the resources needed; and
  • The employee was conducting that life-saving action, and all other labor rules were met.

Examples include bus drivers deployed to move evacuees and first responders deployed for evacuation or emergency medical care. Where firefighters must be paid portal to portal, FEMA reimburses reasonable costs for up to 14 calendar days from the start of the incident period, with documentation of the need for continuous support.

Documentation

The policy or agreement requiring standby pay, deployment records, and documentation of the need for continuous support.

Watch out · Govstar advice
Standby is different from pre-positioning resources before the incident, which falls under Chapter 7. Equipment standby follows its own rule.
PAPPG v5.0 pp. 83–84
Read this in the PAPPG
Chapter 6 › III.B.6 Other

Does FEMA cover hazard pay, shift differentials or bonuses we paid during the disaster?

Extraordinary hourly pay; bonuses and incentive pay
p. 83
Short answer
Hourly premium pay can be eligible; bonuses are not. Call-back pay, night and weekend differentials and hazardous duty pay for essential employees doing eligible emergency work can be covered when paid under a qualifying pre-disaster labor policy.
What FEMA requires
  • The premium is paid on an hourly basis for hours actually worked on eligible emergency work.
  • It follows a pre-disaster written labor policy that meets FEMA’s conditions.
  • Bonuses and incentive pay are treated as discretionary rewards and are not eligible, even when tied to hazardous conditions from the disaster.
Documentation

The labor policy provision for each premium pay type and timesheets showing the hours it was paid on.

Watch out · Govstar advice
A one-time “disaster bonus” is ineligible however it is labeled.
PAPPG v5.0 p. 83
Read this in the PAPPG
Chapter 6 › III.B.5 Supervisors

Can we claim overtime for department heads, chiefs and managers?

Second-level supervisors (FLSA-exempt)
p. 83
Short answer
Usually not. Second-level supervisors and above, such as commissioners, mayors, department directors and police and fire chiefs, are normally exempt from federal overtime rules, so FEMA treats their overtime as ineligible unless three conditions are all met.
What FEMA requires
  • The supervisor was directly involved with a specific project;
  • You normally charge that person’s time to specific projects, regardless of federal funding; and
  • The overtime was paid under a labor policy that meets FEMA’s conditions.
Documentation

Daily records of the supervisor’s hands-on project work and evidence that their time is normally charged to projects.

Watch out · Govstar advice
Overtime for senior staff is a frequent audit finding. If you claim it, document their hands-on project work day by day.
PAPPG v5.0 p. 83
Read this in the PAPPG
Chapter 6 › III.B.4 Essential Employees Called Back from Furlough

We called furloughed staff back to work because of the disaster. Is their pay eligible?

Essential employees called back from furlough
p. 82
Short answer
Yes. Regular hours for essential employees called back from a budget-related furlough because of the declared incident are eligible, as long as those costs were not budgeted.
What FEMA requires
  • The furlough was budget-related, and the call-back was due to the declared incident.
  • The costs were not already in your budget.
  • The employees performed eligible work.
Documentation

The furlough notice, the call-back notice and timesheets for the eligible work.

Watch out · Govstar advice
Keep the furlough notice and the call-back notice in the file. They prove the hours were unbudgeted.
PAPPG v5.0 p. 82
Read this in the PAPPG
Chapter 6 › III.B.3 Backfill Employees

We paid people to cover for staff working on the disaster. Is that eligible?

Backfill
p. 82
Short answer
Some of it. Backfill costs are eligible when the regular employee is away doing eligible emergency work, even though the backfill employee isn’t. Which hours count depends on who does the backfilling.
What FEMA requires
  • Overtime only when the backfill employee is budgeted or is called in from scheduled leave.
  • Regular hours too when the backfill employee is a contracted or temporary worker, or a permanent employee called in on a scheduled day off.
  • Backfill must be for a limited time based on the exigency, and you must track and document the added costs.
  • The trigger is the regular employee doing eligible emergency work, not being on leave or furloughed.
Documentation

Records linking each backfill shift to the employee being covered and that employee’s eligible emergency work.

Watch out · Govstar advice
Regular hours for budgeted backfill staff are not eligible, even when framed as an increased operating cost.
PAPPG v5.0 p. 82
Read this in the PAPPG
Chapter 6 › III.B.1–2 Reassigned Employees

We moved staff from their normal jobs to disaster work. What does FEMA pay?

Reassigned employees
pp. 81–82
Short answer
Costs for employees reassigned to work outside their normal duties are eligible at their normal pay rate, not the rate for the work they did. A police officer clearing debris is paid at the officer’s rate.
What FEMA requires
  • Pay is based on the employee’s normal rate, because that is your actual cost.
  • If the employee is paid from an outside source, such as a federal grant or dedicated funds, their regular hours are eligible only when reassigned to eligible emergency work that source doesn’t fund. FEMA must confirm there is no duplication of benefits first.
Documentation

The employee’s normal assignment and funding source, and daily records of the disaster work performed.

Watch out · Govstar advice
Document both the employee’s normal assignment and the disaster work, so the reassignment is clear.
PAPPG v5.0 pp. 81–82
Read this in the PAPPG
Chapter 6 › III.B Eligibility Criteria for Reimbursement of Employee Labor Costs

Will FEMA pay our employees’ regular hours, or only overtime?

Budgeted and unbudgeted labor; straight time and overtime
pp. 80–81
Short answer
It depends on the type of work. For permanent work (Categories C–G), FEMA pays both regular and overtime hours. For emergency work (Categories A–B), FEMA generally pays only overtime for employees already in your budget, but pays both regular and overtime hours for unbudgeted staff.
What FEMA requires

Pay for employees on leave of any kind is not eligible, and neither is administrative leave for staff sent home because of emergency conditions.

<table class="pt-table"><thead><tr><th>Who</th><th>Regular hours</th><th>Overtime</th></tr></thead><tbody><tr><td>Budgeted employees, emergency protective measures (Cat. B)</td><td>Not eligible</td><td>Eligible</td></tr><tr><td>Budgeted employees, debris removal (Cat. A) under alternative procedures</td><td>Eligible</td><td>Eligible</td></tr><tr><td>Unbudgeted staff on emergency work: externally funded reassigned employees, essential employees called back from furlough, temporary hires, part-time or seasonal staff working outside their normal hours</td><td>Eligible</td><td>Eligible</td></tr><tr><td>Any employee on permanent work (Cat. C–G)</td><td>Eligible</td><td>Eligible</td></tr><tr><td>Building code and floodplain work (Cat. I)</td><td>Extra hires only</td><td>Eligible</td></tr></tbody></table>
Documentation

Timesheets that separate regular and overtime hours by project and category of work, plus your budget showing which positions are budgeted. Source: PAPPG Table 11.

Watch out · Govstar advice
“Budgeted” is the key word. Regular-time pay you would have spent anyway is not an emergency-work cost.
PAPPG v5.0 pp. 80–81 (Table 11) · 44 CFR 206.228(a)(2) · Stafford Act § 406(a)(2)(C) and § 428(e)(2)(D)
Read this in the PAPPG
Chapter 6 › III.A Labor Policies

Do we need a written pay policy for FEMA to cover overtime and premium pay?

Pre-disaster written labor policy
p. 80
Short answer
Yes. FEMA decides which labor costs are eligible based on the written labor policy you had in place before the disaster. If your policy doesn’t meet FEMA’s three conditions, FEMA pays only your standard, uniformly applied pay rates.
What FEMA requires

The policy must:

  • Not make payment contingent on federal funding;
  • Apply the same way whether or not there is a presidential declaration; and
  • Set non-discretionary criteria for when each pay type is triggered.

“Pre-disaster” means before the incident start date in the declaration, so a policy adopted during the incident period does not count.

Documentation

Keep a dated copy of the labor or pay policy in effect before the incident start date, and show it was applied in non-declared events.

Watch out · Govstar advice
A policy that lets managers decide case by case when to pay premium rates fails the non-discretionary test.
PAPPG v5.0 p. 80
Read this in the PAPPG
Chapter 6 › III. Applicant (Force Account) Labor

How does FEMA pay for our employees’ time, and what records do we need?

Force account labor
pp. 78–79
Short answer
FEMA reimburses your employees’ actual hourly pay plus the actual cost of their fringe benefits, calculated as a percentage of the hourly rate. Overtime usually carries a different fringe percentage than regular time, because some benefits, such as health insurance, don’t depend on hours worked.
What FEMA requires
  • Benefits must be provided under established written policies. Eligible fringe can include holiday, sick and vacation leave accrual, Social Security and Medicare matching, unemployment insurance, workers’ compensation, retirement, and health, life and disability insurance.
  • Calculate fringe as a percentage of the hourly pay rate, separately for regular time and overtime.
Documentation
  • Small projects: an itemized summary with the number of employees, total budgeted and unbudgeted hours, and average regular and overtime rates with fringe. Averages may be used only for employees at similar pay grades and the same employee category.
  • Large projects: your pay policy plus, for each employee, name, employee type, job title and function, dates and hours worked, pay and fringe rates, a description of the work with daily logs, timesheets, and fringe calculations.

Source: PAPPG Table 10.

Watch out · Govstar advice
FEMA may review a sample rather than every record, so every timesheet in the file needs to hold up.
PAPPG v5.0 pp. 78–79
Read this in the PAPPG
Govstar summarizes FEMA’s Public Assistance Program and Policy Guide, version 5.0 Amended, for disasters declared on or after January 6, 2025. “Watch out” notes are Govstar practitioner advice, not FEMA policy. Govstar is independent and not affiliated with FEMA. This is general guidance, not legal advice.