PAPPG v5.0 · Chapter 8 · pages 167–226

Permanent Work Eligibility

What FEMA pays to repair, restore or replace damaged facilities (Categories C–G): roads and bridges, water control facilities, buildings and equipment, utilities, and parks. It covers codes and standards, Section 406 mitigation, improved and alternate projects, the 50 percent repair-or-replace rule, floodplains and the insurance FEMA requires afterward. Every section is written as the question applicants actually ask, with FEMA’s requirements, the records you need, and the exact PAPPG pages.

27 topicsCategories C–GDue 18 months from declarationRepair or replace: the 50% rule
Jump to a part of the chapter
Chapter 8 › XI. Building Code and Floodplain Management Administration and Enforcement (Category I)

Can FEMA pay for our extra permitting and inspection work after the disaster?

Category I: Building code and floodplain management administration and enforcement
pp. 221–226
Short answer
Yes. Administering and enforcing building codes and floodplain ordinances for disaster-damaged structures, public, private and residential, is eligible from the start of the incident period through 180 days after the declaration is amended to authorize permanent work. There are no extensions.
What FEMA requires
  • Eligible: permit and plan review, inspections, enforcement, elevation certificates, condemnation determinations, substantial damage determinations and appeals, monitoring unpermitted work, staff training, contracting and public outreach.
  • Eligible regardless of whether the code meets PA’s facility-restoration criteria.
  • Ineligible: work on non-disaster structures, and adopting or updating codes, ordinances, zoning or land use plans.
  • Communities suspended or sanctioned by the NFIP are ineligible.
  • Labor: budgeted staff overtime only; unbudgeted staff regular and overtime.
  • Category I work can’t be the basis of an alternate project or carry a mitigation proposal.
Documentation

Small projects: a list of activities and number of locations. Large projects: activity logs or sign-ins, locations with addresses or GPS, and rights-of-entry where needed. Source: PAPPG Table 30.

Watch out · Govstar advice
Start the 180-day clock tracking on day one. Surge permitting and substantial damage work often runs past the window, and FEMA won’t extend it.
PAPPG v5.0 pp. 221–226 · Stafford Act §§ 402, 406 (DRRA § 1206)
Read this in the PAPPG
Chapter 8 › X. Requirement to Obtain and Maintain Insurance

Do we have to insure facilities FEMA helps repair?

Requirement to obtain and maintain insurance
pp. 220–221
Short answer
Yes. For permanent work on insurable buildings, contents, equipment and vehicles, you must obtain and keep insurance against the hazard that caused the damage, in an amount based on eligible costs before reductions. If you don’t, FEMA denies or deobligates the funds and the facility is ineligible in future disasters.
What FEMA requires
  • The requirement is waived when eligible costs for the insurable facility are $5,000 or less.
  • It applies to improved and alternate projects too, for the life of the work or the facility, whichever is shorter.
  • FEMA can modify the requirement if coverage isn’t reasonably available and isn’t necessary; it won’t require more than the state insurance commissioner certifies as reasonable.
  • Commercial policies, blanket policies, flood policies, pools or approved self-insurance can satisfy it.
  • If you can’t insure yet (for example, during reconstruction), a letter of commitment holds the project until proof of coverage.
Documentation

Proof of coverage by type and amount, or a letter of commitment. See FEMA Recovery Policy FP 206-086-1.

Watch out · Govstar advice
Track obtain-and-maintain obligations in a register by facility and disaster. A lapse years later can claw back old funding and bar future help.
PAPPG v5.0 pp. 220–221 · Stafford Act § 311 · 44 CFR 206.253
Read this in the PAPPG
Chapter 8 › IX.C Facility Located in a Special Flood Hazard Area

Why would FEMA cut funding for an uninsured building in a flood zone?

NFIP reduction in special flood hazard areas
pp. 219–220
Short answer
For an insurable building in a special flood hazard area that is damaged by flooding and uninsured, FEMA must reduce funding by the maximum NFIP policy payout or the value of the building and contents, whichever is less.
What FEMA requires
  • The reduction applies when the area has been mapped as a special flood hazard area for more than one year.
  • If you believe the map is wrong, request a Letter of Map Amendment or Revision within 6 months of the declaration. If approved, funding can be reinstated. Costs of pursuing it are ineligible.
  • Nonprofit facilities in non-participating communities aren’t reduced, but the community must join the NFIP within 6 months and the nonprofit must buy flood insurance.
Documentation

Flood insurance policies, flood maps, and any map amendment request and decision.

Watch out · Govstar advice
Check flood zone status and NFIP coverage for every insurable building now. This reduction can wipe out most of a building’s funding.
PAPPG v5.0 pp. 219–220 · Stafford Act § 406(d)(2) · 44 CFR 206.252
Read this in the PAPPG
Chapter 8 › VIII–IX Environmental Requirements; Facility Located in or Impacting a Floodplain

What extra rules apply when we rebuild in a floodplain or wetland?

Floodplain management and wetland protection; 8-step decision-making process
pp. 214–219
Short answer
FEMA must avoid floodplains and wetlands when practicable alternatives exist, using its 8-step decision process for projects over $18,000. New construction is barred in coastal high hazard areas and floodways, and critical facilities must consider the 500-year floodplain.
What FEMA requires
  • Alternatives considered: no action, other locations, and other actions including natural features. Projects stay in the floodplain only if no viable alternative exists.
  • Critical actions (such as hospitals, schools, nursing homes, hazardous materials, emergency services) use the 0.2 percent (500-year) floodplain; others use the 1 percent (100-year) floodplain.
  • Substantially damaged or improved structures in coastal high hazard areas must be elevated on open foundations and anchored.
  • Wetland work needs Corps permits; failing to get them can lead to denial or deobligation.
  • Floodplain ordinance upgrades in NFIP communities are eligible if the ordinance meets the code criteria and the work is disaster-related; repair is capped at replacement cost except for historic facilities.
  • Hydrologic and hydraulic studies are eligible when needed, such as for altered culverts or bridges in flood hazard areas.
Documentation

Floodplain maps, permits, any H&H study by a licensed engineer, and the alternatives analysis.

Watch out · Govstar advice
Flag floodplain sites at the start. The 8-step review and any H&H study take time, and starting work first can cost the funding.
PAPPG v5.0 pp. 214–219 · 44 CFR Part 9 · EO 11988, EO 11990
Read this in the PAPPG
Chapter 8 › VII. Relocation

Can FEMA fund moving a facility to a safer location?

Relocation
pp. 212–214
Short answer
Yes, in three ways: FEMA can require relocation of a destroyed facility facing repetitive heavy damage, you can choose to relocate through an improved project, or a code may require relocation.
What FEMA requires
  • FEMA-directed: the Regional Administrator may require relocation if the facility faces repeated heavy damage, approval isn’t barred, and it is cost-effective. Relocation cheaper than rebuilding in place is cost-effective; otherwise FEMA runs a benefit-cost analysis.
  • Applicant-driven: relocate through an improved project, capped at replacement cost if destroyed or repair cost if repairable.
  • Code-driven: if a code requires relocation but relocation isn’t eligible, funding is capped at repair without relocation costs, as an improved project.
  • Eligible relocation work: land acquisition (only as much as needed), support facilities such as roads, parking and utilities, and demolition of the original.
  • After a required relocation, FEMA won’t fund future repairs at the original site except open-space uses. Buyers of the original site must be told.
Documentation

Damage history, cost comparison or benefit-cost analysis, land needs, and environmental review before acting at the original site.

Watch out · Govstar advice
If FEMA requires relocation and you don’t want it, an alternate project lets you use the funds elsewhere. Ask before rejecting the relocation.
PAPPG v5.0 pp. 212–214 · 44 CFR 206.226(g)
Read this in the PAPPG
Chapter 8 › VI. Repair vs. Replacement

How does FEMA decide whether to repair or replace a damaged facility?

Repair vs. replacement; 50 percent rule
pp. 207–212
Short answer
A facility is repairable if the repair cost is 50 percent or less of the replacement cost and it can be repaired to work as well as before. Above 50 percent, or if repair isn’t feasible, replacement is eligible.
What FEMA requires
  • Submit replacement requests within one year of the declaration, with both estimates.
  • Replacement requests over $5 million get an independent third-party review.
  • If you repair a facility eligible for replacement, FEMA pays the lesser of repair or replacement.
  • The rule isn’t applied to building components (roofs, HVAC, windows). For systems with separable parts, it applies to each component, such as manhole-to-manhole pipe or a single clarifier.
  • A floodplain manager’s substantial damage determination is separate from the 50 percent rule.
  • Demolishing a facility eligible for replacement, and cost-effective mitigation, are eligible on the replacement project.
<table class="pt-table"><thead><tr><th>Cost</th><th>Repair estimate (numerator)</th><th>Replacement estimate (denominator)</th></tr></thead><tbody><tr><td>Repair of disaster damage, with codes for the damaged elements</td><td>Included</td><td>—</td></tr><tr><td>Replacement to pre-disaster size, capacity and function, with codes</td><td>—</td><td>Included</td></tr><tr><td>Upgrades to undamaged elements (e.g. elevating the whole facility)</td><td>Excluded</td><td>—</td></tr><tr><td>Floodplain elevation or floodproofing of a substantially damaged facility</td><td>Excluded</td><td>Included</td></tr><tr><td>Demolition</td><td>Only selective demolition needed for the repair</td><td>Excluded</td></tr><tr><td>Site work, soft costs, contents, mitigation, emergency work</td><td>Excluded</td><td>Excluded</td></tr></tbody></table>
Documentation

Repair and replacement estimates prepared to FEMA’s estimating requirements, with the calculation and any feasibility study.

Watch out · Govstar advice
Build both estimates using the same exclusions FEMA uses. Including site work or soft costs in your repair number is the most common miscalculation.
PAPPG v5.0 pp. 207–212 · 44 CFR 206.226(f)
Read this in the PAPPG
Chapter 8 › V.F Landslides and Slope Stabilization

A landslide damaged our facility. Will FEMA fix the slope as well as the facility?

Landslides and slope stabilization (permanent work)
p. 207
Short answer
FEMA first determines whether the slope is stable. Restoring the facility and the ground that supports it is eligible unless the slope was unstable before the disaster, in which case you must stabilize it first.
What FEMA requires
  • Stable site: facility and its integral ground are eligible.
  • Unstable, no evidence of earlier instability: facility, integral ground and stabilization are eligible.
  • Unstable with earlier instability: integral ground is ineligible; the facility is eligible only after you stabilize the site.
  • Inspections and limited geotechnical work to determine stability and cause are eligible.
  • Stabilizing natural ground that doesn’t support the facility is generally ineligible. Relocation may be approved for repeated heavy damage if cost-effective.
Documentation

Geotechnical findings on stability and cause, and evidence of the slope’s pre-disaster condition.

Watch out · Govstar advice
Look for prior slope movement records before claiming. Evidence of earlier instability shifts stabilization costs to you.
PAPPG v5.0 p. 207
Read this in the PAPPG
Chapter 8 › V.E Parks, Recreational, Other (Category G)

Will FEMA repair parks, pools, docks and beaches?

Category G: Parks, recreational, other
pp. 204–206
Short answer
Publicly owned parks, playgrounds, pools, docks, piers, golf courses, ports, mass transit and similar facilities are Category G. Beaches qualify only if engineered and maintained with a renourishment program; sand lost in the incident is then eligible.
What FEMA requires
  • Grass and sod are eligible when integral to restoring a recreational facility; trees, shrubs and landscaping are not.
  • Plantings required by a permit or code to offset environmental impacts can be eligible; long-term monitoring is not.
  • Beaches: not built under Corps authority, built with imported sand to a design, and maintained with periodic renourishment. One-time, emergency, partial or dredge-spoil placements don’t count.
  • Eligible sand is limited to the amount lost, shown with pre- and post-storm profiles to the depth of closure.
  • Beach access crossovers are eligible facilities.
Documentation

For beaches: original design and as-builts, the maintenance plan and funding, and every renourishment’s design and as-builts.

Watch out · Govstar advice
Keep a complete renourishment history. Without it, an engineered beach is treated as natural and its sand is ineligible.
PAPPG v5.0 pp. 204–206 · 44 CFR 206.226(j)
Read this in the PAPPG
Chapter 8 › V.D.3 Power: Transmission and Distribution System Conductor Replacement

When will FEMA pay to replace power line conductors instead of repairing them?

Transmission and distribution conductor replacement
pp. 202–204
Short answer
When a line section can’t be effectively repaired and re-sagged, measured against FEMA’s damage thresholds. Eligible sections can be replaced with #2 ACSR conductor, or with advanced conductors where codes are adopted or through mitigation or an improved project.
What FEMA requires

You define the line section: a single span, all spans between dead-end structures, a feeder, a tap or any contiguous group. Adjustments to accommodate #2 ACSR, such as span lengths and pole heights, are eligible without citing a code. If no threshold is met, only repair is eligible.

<table class="pt-table"><thead><tr><th>A line section can be reconductored if…</th><th>Threshold</th></tr></thead><tbody><tr><td>Conductor spans with visible damage (broken strands, splices, sleeves, pitting, burns, kinks)</td><td>25% or more</td></tr><tr><td>Line spans stretched out of sag or failing clearance</td><td>30% or more</td></tr><tr><td>Poles needing replacement or straightening</td><td>40% or more</td></tr><tr><td>Other supporting structures damaged (cross-arms, braces, insulators, guys, anchors)</td><td>40% or more</td></tr><tr><td>Any combination of the above</td><td>65% or more</td></tr><tr><td>A licensed engineer shows the conductor is damaged beyond repair</td><td>Engineering evidence</td></tr></tbody></table>
Documentation

A signed, stamped letter from a licensed engineer with direct system experience certifying pre-disaster capacity and condition, with maintenance records, work plans, any RUS corrective action plans and staking sheets. Source: PAPPG Table 29.

Watch out · Govstar advice
Choose line sections strategically. A well-drawn section can meet a threshold that the whole feeder averages out of.
PAPPG v5.0 pp. 202–204
Read this in the PAPPG
Chapter 8 › V.D.1–2 Utilities; Power Restoration; Right-of-Way Clearance

How does FEMA handle damaged utilities and power restoration?

Category F: Utilities; power restoration
pp. 201–202
Short answer
Water, power, natural gas, sewer and communication systems are Category F. Power restoration that is both an emergency and permanent work can be claimed as either Category B or Category F, with different consequences.
What FEMA requires
  • Claimed as Category B: regular hours of budgeted staff are not eligible, and no hazard mitigation is available.
  • Claimed as Category F: mitigation is available.
  • Maintaining your right-of-way is your responsibility. FEMA funds limited clearance of incident debris to reach the facility, and removal of damaged trees an arborist confirms threaten it. Further clearance is ineligible.
Documentation

Records supporting the category choice, crew timesheets, arborist findings for tree removal, and maintenance records for the right-of-way.

Watch out · Govstar advice
Decide Category B or F for power restoration deliberately. F keeps budgeted regular time and mitigation in play.
PAPPG v5.0 pp. 201–202
Read this in the PAPPG
Chapter 8 › V.C.3–4 Equipment; Vehicles

Will FEMA repair or replace our damaged equipment and vehicles?

Equipment; vehicles (Category E)
p. 201
Short answer
Yes. Repairing damaged equipment or replacing destroyed items with the same number of comparable items (similar age, condition and capacity) is eligible. If replacement costs less than repair, FEMA pays the replacement cost.
What FEMA requires
  • You may replace with different items for the same general purpose; FEMA caps the cost at comparable items.
  • If a comparable used item isn’t reasonably available or doesn’t meet national consensus standards, a new item of similar capacity is eligible.
  • Vehicles that can’t be repaired are valued with “blue book” or similar guides.
Documentation

Equipment inventories, age and condition records, repair estimates, and replacement quotes.

Watch out · Govstar advice
Keep your fleet and equipment inventory with ages and condition. It sets the comparable-item value FEMA uses.
PAPPG v5.0 p. 201 · 44 CFR 206.226(h)
Read this in the PAPPG
Chapter 8 › V.C.2.iv–v Research-Related Contents; Animals

Can we replace research reagents, specimens and animals lost in the disaster?

Research-related contents; animals
pp. 199–200
Short answer
Yes, within limits. Reagents and specimen collections that are commercially available can be replaced to restore basic research. Animals housed or exhibited in eligible facilities, such as police dogs, zoo and hatchery animals and lab animals, can be replaced with comparable animals.
What FEMA requires
  • Reagents: the lower of the number lost or the number needed to restore basic research, at the lesser of commercial or institutional prices. Unique reagents produced by research are not eligible.
  • Specimen collections: a representative portion, if purchasable and supporting an ongoing eligible educational or medical program.
  • Animals: replacement when killed, injured beyond their purpose, or destroyed specimens, if comparable animals are available at reasonable cost; loaned animals if you were legally responsible.
  • Lab animals: the genetically closest commercially available animal. Breeding programs, re-creating genetic lines and surgical alterations are ineligible.
Documentation

Inventories of reagents, specimens and animals, purchase records, and expert input on genetic likeness for lab animals.

Watch out · Govstar advice
Keep research and animal inventories backed up off-site. Market-survey pricing depends on knowing exactly what was lost.
PAPPG v5.0 pp. 199–200
Read this in the PAPPG
Chapter 8 › V.C.2.i–iii Contents and Supplies

Will FEMA replace damaged contents, records, books and museum collections?

Contents and supplies; files; library books; irreplaceable collections
pp. 196–199
Short answer
Damaged contents are eligible even if the building wasn’t damaged, replaced with comparable items. Files can be recovered and copied, library books replaced from the pre-disaster inventory, and irreplaceable collections stabilized and treated, but not replaced.
What FEMA requires
  • Files: recovering, stabilizing (including freeze-drying), sanitizing, copying or scanning damaged hard copies, and recovering data from damaged drives. Not new databases, re-keying lost data, or digitizing re-established files.
  • Library books: replacement based on the pre-disaster inventory, plus re-shelving and cataloging. Special collections (rare books, manuscripts) are eligible only for treatment.
  • Collections and objects: stabilization and needed treatment by a qualified conservator, treatment plans, and display and storage equipment. Restoring to original condition (removing old varnish) and replacing destroyed irreplaceable items are not eligible.
Documentation

Pre-disaster inventories, accession and catalog records, and conservator treatment plans.

Watch out · Govstar advice
Keep a current, off-site inventory of contents and collections. Replacement is capped at what you can show you had.
PAPPG v5.0 pp. 196–199
Read this in the PAPPG
Chapter 8 › V.C.1 Buildings

How does FEMA decide what building damage it will repair?

Category E: Buildings and equipment
pp. 195–196
Short answer
Repairing disaster damage to all structural and non-structural building components, including mechanical, electrical and plumbing, is eligible. Insurance is expected to be the primary source of recovery for buildings, contents, equipment and vehicles.
What FEMA requires
  • FEMA weighs maintenance evidence, signs of pre-existing problems such as old leaks, the severity of the incident, and whether you acted promptly to prevent more damage.
  • Mold remediation and mud removal are permanent work when done with the facility’s restoration.
  • Public housing authority buildings are eligible only if Congress doesn’t fund HUD for their emergency capital needs.
  • Detailed studies of earthquake damage to welded steel moment frames need FEMA approval before the work starts.
Documentation

Maintenance records, photos of pre- and post-disaster condition, and records of steps taken to prevent further damage.

Watch out · Govstar advice
Document how you protected the building in the first days, such as tarps, dry-out and boarding. It is your answer to a pre-existing damage challenge.
PAPPG v5.0 pp. 195–196
Read this in the PAPPG
Chapter 8 › V.B Water Control Facilities (Category D)

Will FEMA repair levees, channels, basins and other water control facilities?

Category D: Water control facilities
pp. 194–195
Short answer
Yes, for eligible non-federal facilities such as dams, levees, engineered channels, canals, basins, pumping facilities and shoreline protection. Restoring the capacity of channels, basins and reservoirs requires proof of pre-disaster capacity and regular maintenance.
What FEMA requires
  • Capacity restoration is eligible only for facilities not built by a federal agency, with documented pre-disaster capacity and a regular maintenance schedule. Complaint-driven clean-outs don’t prove regular maintenance.
  • Removing material not deposited by the incident turns the project into an improved project.
  • Flood control works under another federal agency’s authority are ineligible.
  • Secondary levees on the river side of a primary levee are ineligible unless they protect human life.
Documentation

Pre-disaster capacity data, such as recent or multi-year surveys, and a written maintenance plan or activity logs. Source: PAPPG Table 28.

Watch out · Govstar advice
Survey your channels and basins on a schedule. A current baseline turns a capacity claim from a dispute into a calculation.
PAPPG v5.0 pp. 194–195
Read this in the PAPPG
Chapter 8 › V.A.4.iv–v Closed Basin Flooding; Gravel Roads

What about roads in closed basins that stay flooded, and gravel roads?

Closed basin flooding; gravel roads
pp. 191–194
Short answer
For closed basins where water can’t drain, FEMA may fund raising the grade of critical routes facing long-term loss of use. Gravel loss must be proven, not assumed, and only the damaged sections are eligible.
What FEMA requires
  • Closed basins: only routes critical to restoring traffic service, judged by functional class, essential services and detour availability. A permanent reroute may be funded if more cost-effective.
  • Raising chronic low spots is not the intent of the program.
  • Gravel: show actual loss with work logs and invoices for gravel placed in that section within 12 months before the incident, and photos of displaced gravel.
  • Washboarding (corrugation) is ineligible; rutting is ineligible except from emergency vehicles or a required single-access reopening.
Documentation

Closed basin: evidence the basin hit historic highs during the incident period, water level and rainfall records, and projected closure duration. Gravel: logs, invoices and photos. Source: PAPPG Tables 25–27.

Watch out · Govstar advice
Keep gravel placement logs by road section every year. They are the only reliable proof of gravel loss after a flood.
PAPPG v5.0 pp. 191–194
Read this in the PAPPG
Chapter 8 › V.A.4 Inundated and Submerged Roads

Our roads were under water. What damage will FEMA pay to repair?

Inundated and submerged roads
pp. 189–191
Short answer
Only visible, quantifiable surface damage directly caused by the disaster, such as washouts, collapses and slips, identified after the water recedes. Claims based only on inundation, subsurface testing or a projected loss of service life are ineligible.
What FEMA requires
  • Testing sections without visible damage (ground-penetrating radar, cores, borings, deflection testing) is ineligible.
  • Damage from reopening saturated roads too early is usually treated as negligence, except damage from vehicles doing eligible emergency work or on single-access roads that had to reopen.
  • A road’s inclusion in the preliminary damage assessment doesn’t make it eligible.
Documentation

Pre- and post-disaster photos or video for each section; maintenance records or a pavement management program; and records of any repairs. For early reopening: the justification, emergency call logs and route maps, or proof no detour existed. Source: PAPPG Tables 23–24.

Watch out · Govstar advice
Keep roads closed until they dry out where you can, and log every closure and reopening decision.
PAPPG v5.0 pp. 189–191
Read this in the PAPPG
Chapter 8 › V.A Roads and Bridges (Category C)

Which road and bridge damage will FEMA repair?

Category C: Roads and bridges
pp. 186–188
Short answer
Repairing disaster damage to public roads and bridges your agency is legally responsible for is eligible. Federal-aid routes are not, because the Federal Highway Administration covers them, even when its Emergency Relief program isn’t activated or doesn’t pay.
What FEMA requires
  • Road components include surfaces, bases, shoulders, ditches, culverts, swales, low-water crossings, lighting, sidewalks, guardrails and signs. Bridge components include decking, girders, abutments, piers, slope protection and approaches.
  • Private roads (orphan roads, gated communities, homeowners’ association roads) are ineligible for permanent work.
  • Tribal roads remain eligible even if BIA or FHWA funded their construction or maintenance, unless FHWA Emergency Relief funds the repair. Tribal roads are eligible even if not open to the public.
  • Maintenance, potholes and fatigue cracking are generally ineligible; FEMA reviews maintenance records.
  • Scour and erosion repair is eligible only to restore the ground supporting an eligible road, bridge, culvert or drainage structure.
  • Replacing or upsizing culverts may need a hydrologic and hydraulic study, which is eligible.
Documentation

Maintenance records or invoices and activity logs, photos, and damage measurements for each site.

Watch out · Govstar advice
Check each road’s functional classification first. Damage on a federal-aid route is never a PA project, so don’t spend time scoping it.
PAPPG v5.0 pp. 186–188
Read this in the PAPPG
Chapter 8 › IV.C Alternate Project

Can we use the funds for a different facility instead of rebuilding the damaged one?

Alternate project (capped)
pp. 185–186
Short answer
Yes, with FEMA approval, if restoring the original function doesn’t serve the public welfare. Funds go to a permanent work project benefiting the public in the same general area, capped at the lesser of the federal share of the restoration estimate or of actual costs.
What FEMA requires
  • Allowed uses: repairing, expanding, mitigating or building other eligible facilities; demolition; capital equipment of $10,000 or more per unit; covering flood insurance reductions in flood hazard areas; supplementing an improved project; and cost-effective mitigation.
  • Not allowed: budget shortfalls, community plans, landscaping, operating expenses, items under $10,000, the non-federal share of any PA project, buyouts, projects using other federal grants, or projects in a floodway.
  • Construction needs FEMA approval before it starts, for environmental compliance.
  • Mitigation included in the original scope is dropped from the alternate project cap.
  • Temporary facility costs stop when you request an alternate project.
Documentation

Your request explaining why restoration doesn’t serve the public, the alternate project scope and location, and FEMA approval.

Watch out · Govstar advice
Requesting an alternate project ends temporary facility funding for that service. Time the request accordingly.
PAPPG v5.0 pp. 185–186 · 44 CFR 206.203(d)(2)
Read this in the PAPPG
Chapter 8 › IV.A–B Flexible Restoration; Improved Project

Can we use FEMA funds to rebuild bigger or better than before?

Improved project (capped)
pp. 183–185
Short answer
Yes, as an improved project, if the facility keeps its pre-disaster function. FEMA’s funding is capped at the lesser of the federal share of the approved restoration estimate or the federal share of your actual costs.
What FEMA requires
  • Examples: paving a gravel road, rebuilding a two-bay firehouse with three bays, meeting a code that fails FEMA’s criteria, or relocating a facility FEMA didn’t require you to move.
  • Get recipient approval before proceeding; FEMA reviews environmental compliance if the configuration changes significantly.
  • The cap increases only for errors or omissions in the original restoration scope or estimate.
  • Mitigation is limited to what the original design would have received, and is deobligated if not completed or if the facility is replaced or relocated.
  • You can combine PA with other federal funds, but not for the same work, and generally not for the PA cost share (CDBG-DR is a possible exception).
Documentation

Recipient approval, the capped restoration estimate, and the improved project scope and actual costs.

Watch out · Govstar advice
Decide on an improved project before formulation if you can. Converting an obligated project later caps that site and slows everything around it.
PAPPG v5.0 pp. 183–185 · 44 CFR 206.203(d)(1)
Read this in the PAPPG
Chapter 8 › III.C, III.E–F Historic Preservation; Construction Method; Pre-Existing Site Conditions

Can we change materials or methods, and what about historic buildings and pre-existing problems?

Historic preservation compliance; construction method; pre-existing site conditions
pp. 182–183
Short answer
Historic facilities can be restored as a code requires even if repair costs more than replacement. Changes in construction method or materials are approved when access, site conditions or tie-ins require them. Pre-existing damage must be fixed at your own cost before FEMA funds the repair.
What FEMA requires
  • For a facility listed in or eligible for the National Register, costs to meet a code that requires repair in a specific way are eligible even above replacement cost.
  • State historic building codes usually allow alternatives rather than require specific work, so they rarely meet the code eligibility criteria.
  • Changes to design or materials must not change capacity or function, and must be reasonable and consistent with your normal practice and legal requirements.
  • If unrepaired pre-existing conditions would compromise the repair, such as rotting timbers under a damaged bridge deck, FEMA funds the disaster repair only after you repair the pre-existing damage yourself.
Documentation

Historic status documentation, the code requiring specific treatment, and engineering justification for any change in method or materials.

Watch out · Govstar advice
Identify pre-existing problems during scoping and budget for them. FEMA won’t release funds for the disaster repair until they are addressed.
PAPPG v5.0 pp. 182–183 · 44 CFR 206.226(f)(2)–(3)
Read this in the PAPPG
Chapter 8 › III. Hazard Mitigation

Can FEMA pay to make our facility stronger than before?

PA hazard mitigation (Section 406)
pp. 178–182
Short answer
Yes, through PA hazard mitigation, which funds cost-effective measures beyond codes and standards that reduce future damage to the damaged parts of a facility. It applies only to permanent work projects (Categories C–G), not emergency work.
What FEMA requires
  • Measures must directly reduce future damage to the damaged portion of the facility, be technically feasible, comply with environmental and historic requirements, and not create new hazards.
  • Separate measures, such as floodwalls, new drainage along a damaged road, defensible space, or dry floodproofing of interdependent buildings, can qualify if they protect the damaged portion.
  • Code-required upgrades are not mitigation; mitigation is the work above code.
  • Engineering and design to develop a mitigation proposal are eligible if included in the approved scope.
  • If you don’t complete approved mitigation, FEMA deobligates it. PA and HMGP funds can be used on the same facility, but not for the same work.
  • Mitigation done after a quick repair, or before FEMA could review it, can still be eligible if cost-effective and environmentally compliant.
<table class="pt-table"><thead><tr><th>A 406 measure is cost-effective if…</th><th>Basis</th></tr></thead><tbody><tr><td>Its cost is no more than 15% of the facility’s eligible repair cost (before insurance reductions)</td><td>15 percent rule</td></tr><tr><td>It is listed in PAPPG Appendix J and costs no more than 100% of the eligible repair cost</td><td>Pre-approved measures</td></tr><tr><td>A benefit-cost analysis using FEMA’s BCA Toolkit shows benefits exceed costs</td><td>Benefit-cost analysis</td></tr></tbody></table>
Documentation

A hazard mitigation proposal with scope, cost, cost-effectiveness basis and environmental information.

Watch out · Govstar advice
Raise mitigation at the first site inspection. Once a project is obligated without it, adding mitigation takes far longer.
PAPPG v5.0 pp. 178–182 · Appendix J · 44 CFR 206.226(e)
Read this in the PAPPG
Chapter 8 › II.E–F Accessibility; Path of Travel

Will FEMA pay for accessibility upgrades when we repair a building?

Accessibility for individuals with disabilities; path of travel
pp. 176–177
Short answer
Yes. ADA and other disability-rights requirements triggered by the repair are eligible, whether or not the facility complied before, unless you were cited for a violation before the disaster and didn’t fix it. Path-of-travel upgrades are capped at 20 percent of the cost to restore the primary function area.
What FEMA requires
  • Path-of-travel work can include accessible entrances, routes, parking, restrooms, water fountains and emergency routes serving a damaged primary function area.
  • Alterations must have a reasonable, technically supportable relationship to the damaged elements, such as grab bars, larger stalls or accessible faucets.
  • Above the 20 percent cap, prioritize the elements that provide the most access.
  • Requirements triggered by ineligible repairs are ineligible.
  • Historic buildings may have exceptions, worked out with the historic preservation officer.
<table class="pt-table"><thead><tr><th>Situation</th><th>Eligible?</th></tr></thead><tbody><tr><td>ADA upgrades triggered by an eligible repair</td><td>Yes, even if not compliant before</td></tr><tr><td>Facility cited for a violation before the disaster and not corrected</td><td>No, for that violation</td></tr><tr><td>Path-of-travel improvements to undamaged areas serving the damaged primary function area</td><td>Yes, up to 20% of the primary function area restoration cost</td></tr></tbody></table>
Documentation

The accessibility requirements triggered, the primary function area repair cost, and the path-of-travel cost calculation.

Watch out · Govstar advice
Calculate the 20 percent cap from the full primary function area repair cost, including roof, HVAC and associated rooms. Leaving those out shrinks your cap.
PAPPG v5.0 pp. 176–177 · 28 CFR 35.151(b) · Stafford Act § 308
Read this in the PAPPG
Chapter 8 › II.D, II.G Ineligible Upgrades; Permit Requirements

What upgrades won’t FEMA pay for, and what about extra work our permit requires?

Ineligible upgrades; permit requirements
pp. 175–177
Short answer
Upgrades based on guidelines, recommended practices or other non-mandatory provisions are ineligible, as is added capacity for population growth. Extra work a permitting agency requires is eligible only if it meets four narrow conditions.
What FEMA requires
  • Ineligible: upgrades recommended by design standards, guidelines, policies or industry practices that don’t meet the code criteria.
  • Ineligible: added capacity needed because of growth or increased use, even if a code requires it.
  • Upgrades that improve resistance to future damage may still qualify as Section 406 mitigation or through the Hazard Mitigation Grant Program.
  • Permit-required work under a code that fails the criteria is eligible only if it doesn’t change size, capacity or function; applies to the type of repair; is reasonable for the damage; and is an established, enforced, uniform practice for all similar facilities.
Documentation

The permit and the permitting agency’s written requirement, plus evidence it is applied uniformly to similar projects.

Watch out · Govstar advice
A permitting officer’s discretionary recommendation, such as “build a bridge instead of the culvert,” isn’t a code. Without a written, adopted standard, the extra cost is yours.
PAPPG v5.0 pp. 175, 177
Read this in the PAPPG
Chapter 8 › II.C Codes and Standards Eligibility Criteria

Our code requires upgrades as part of the repair. Will FEMA pay for them?

Codes and standards eligibility criteria
pp. 171–175
Short answer
Only if the code or standard meets five tests: it applies to the type of repair, fits the facility’s pre-disaster use, is reasonable and formally adopted on or before the declaration date (or is a federal legal requirement), applies uniformly, and was enforced.
What FEMA requires
  • Applies to the restoration: repair codes and new-construction codes differ. Replacement facilities get new-construction codes; repairs get only repair-triggered upgrades.
  • Appropriate to pre-disaster use: the least costly of the designed use or the actual use at the time.
  • Reasonable: FEMA weighs the trigger, the extent of damage, engineering defensibility and cost. A huge upgrade on a tiny trigger can be unreasonable.
  • Written, adopted and implemented: approved by the authority having jurisdiction and part of the public record. Codes adopted by a nonprofit for its own facilities, or by agencies without code authority, don’t count.
  • Uniform: applies to all similar facilities, public or private, regardless of cause of damage or funding source, and not at officials’ discretion.
  • Enforced: applied while in effect; if not, related upgrades are ineligible.
Documentation

The code text and adoption record, evidence it is applied uniformly, and enforcement history, such as permits for similar non-disaster work.

Watch out · Govstar advice
Collect proof of past enforcement now. A code you didn’t apply to non-disaster projects won’t fund upgrades after one.
PAPPG v5.0 pp. 171–175 · 44 CFR 206.226(d)
Read this in the PAPPG
Chapter 8 › II.A–B Codes and Standards

Do we have to rebuild to FEMA’s codes and standards, and will FEMA pay for them?

Consensus-based codes, specifications and standards
pp. 168–171
Short answer
Yes. Permanent work on buildings, electric power, roads, bridges, potable water and wastewater facilities must meet the latest consensus-based codes listed in PAPPG Appendix M, and the cost is eligible. Your local codes apply too where they are equal or stricter, or cover other facilities such as dams and levees.
What FEMA requires
  • You must identify which codes apply to each damaged element, describe the work with drawings, quantities and damage-inventory line numbers, and explain any upgrade to undamaged elements.
  • Upgrades to a whole structural system are eligible only if directly related to eligible damage.
  • Where a code allows design choices, FEMA funds the least expensive option unless your engineer shows another gives greater risk reduction.
  • The Regional Administrator can waive the requirement when local codes are equivalent, compliance is technically infeasible, it would be an extraordinary burden, or it would harm a historic property.
  • At completion, provide proof of compliance, such as an engineer’s certification. Failing to include required codes leads to denial or deobligation.
  • Technical help with design and a one-time purchase of a code per disaster are eligible; ongoing operations and maintenance costs are not.
Documentation

A code identification for each element, design documents showing compliance, and a final certification from a registered engineer or other qualified professional.

Watch out · Govstar advice
Put the applicable codes in your scope of work at formulation. Adding them after obligation means re-estimating and re-review.
PAPPG v5.0 pp. 168–171 · Appendix M · 44 CFR 206.226(d)
Read this in the PAPPG
Chapter 8 › I. Facility Restoration (Categories C–G)

What does FEMA pay to rebuild or repair a damaged facility?

Permanent work (Categories C–G); pre-disaster design and function
pp. 167–168
Short answer
Permanent work restores a facility to its pre-disaster design (size and capacity) and function, in line with applicable codes and standards. The facility itself must be eligible, and insurable facilities must then be insured.
What FEMA requires
  • Pre-disaster design is the size or capacity as built or later modified, not how much you were using it. A school designed for 100 students is restored for 100, even if more attended.
  • Pre-disaster function is the use it was designed or formally altered for. If it served a different use without being altered, FEMA funds whichever restoration costs less.
  • Work must comply with environmental and historic preservation requirements.
  • Categories: C roads and bridges; D water control; E buildings and equipment; F utilities; G parks, recreational and other.
Documentation

Design documents or records of later modifications showing the facility’s capacity and function.

Watch out · Govstar advice
Find the as-built drawings early. Without them, proving capacity or function beyond what FEMA sees on site is hard.
PAPPG v5.0 pp. 167–168 · 44 CFR 206.201(i)–(j), 206.226(k)
Read this in the PAPPG
Govstar summarizes FEMA’s Public Assistance Program and Policy Guide, version 5.0 Amended, for disasters declared on or after January 6, 2025. “Watch out” notes are Govstar practitioner advice, not FEMA policy. Govstar is independent and not affiliated with FEMA. This is general guidance, not legal advice.