The Clean Water Act requires Corps of Engineers or state permits before you discharge into, dredge or fill waters, which commonly includes bridge, stream crossing, dock, pier and marina repairs. The Rivers and Harbors Act requires Corps authorization for structures in or over navigable waters. The Safe Drinking Water Act requires FEMA to consult EPA for projects that could contaminate a sole source aquifer.
Section 404 individual permits or statements of compliance with nationwide permits, Rivers and Harbors Act authorizations, state water permits, and information on whether the project is in a sole source aquifer review area.
Get the permit before the excavator goes in the water. Appendix D says permits must be acquired before work begins and documented to FEMA; work done without them can lose its funding.
Any project involving construction in or next to waters of the United States, which can include streams (even intermittent ones), drainage ditches, lakes, ponds and adjacent wetlands, can affect water quality. FEMA’s environmental review looks closely at any construction in or near a water body.
Applicants can check 1:24,000 scale USGS topographic maps or ask the U.S. Army Corps of Engineers (USACE) for a jurisdictional determination. Culvert realignments, channel widening, bridge repairs and pond excavation near water typically need Corps or state permits under the Clean Water Act, obtained before work begins.