Short answer
Emergency work addresses an immediate threat: debris removal (Category A) and emergency protective measures (Category B). Permanent work restores damaged facilities (Categories C–G), including cost-effective hazard mitigation, plus building code and floodplain management administration and enforcement (Category I).
<table class="pt-table"><thead><tr><th>Category</th><th>Type of work</th><th>Covers</th></tr></thead><tbody><tr><td>A</td><td>Emergency work</td><td>Debris removal</td></tr><tr><td>B</td><td>Emergency work</td><td>Emergency protective measures</td></tr><tr><td>C</td><td>Permanent work</td><td>Roads and bridges</td></tr><tr><td>D</td><td>Permanent work</td><td>Water control facilities</td></tr><tr><td>E</td><td>Permanent work</td><td>Buildings and equipment</td></tr><tr><td>F</td><td>Permanent work</td><td>Utilities</td></tr><tr><td>G</td><td>Permanent work</td><td>Parks, recreational and other facilities</td></tr><tr><td>I</td><td>Permanent work</td><td>Building code and floodplain management administration and enforcement</td></tr></tbody></table>
Keep emergency and permanent work costs in separate records from the start. FEMA assigns the categories when it groups your impacts into projects, and the deadlines and documentation differ between them.
Watch out · Govstar practitioner advice
Mixing emergency and permanent work in the same records causes trouble later. Temporary repairs to stop further damage are usually emergency work; restoring the facility is permanent work, with a different deadline.