Can we use FEMA funds to rebuild bigger or better than before?

FEMA term
Improved project (capped)
Short answer

Yes, as an improved project, if the facility keeps its pre-disaster function. FEMA’s funding is capped at the lesser of the federal share of the approved restoration estimate or the federal share of your actual costs.

What FEMA requires

  • Examples: paving a gravel road, rebuilding a two-bay firehouse with three bays, meeting a code that fails FEMA’s criteria, or relocating a facility FEMA didn’t require you to move.
  • Get recipient approval before proceeding; FEMA reviews environmental compliance if the configuration changes significantly.
  • The cap increases only for errors or omissions in the original restoration scope or estimate.
  • Mitigation is limited to what the original design would have received, and is deobligated if not completed or if the facility is replaced or relocated.
  • You can combine PA with other federal funds, but not for the same work, and generally not for the PA cost share (CDBG-DR is a possible exception).

Documentation

Recipient approval, the capped restoration estimate, and the improved project scope and actual costs.

Watch out · Govstar practitioner advice

Decide on an improved project before formulation if you can. Converting an obligated project later caps that site and slows everything around it.