Short answer
For bridges: low-water crossings where traffic is light, restraint cables, uplift tie-downs and abutment protection. For pier ramps: open or floating decking with tie-downs. For roads and railways: stabilized shoulders and embankments and geotextile drainage blankets. For signs: stronger panels, supports and fasteners.
<table class="pt-table"><thead><tr><th>Facility</th><th>Pre-approved measures</th></tr></thead><tbody><tr><td>Bridges</td><td>Low-water crossings where traffic is low; restraint cables; girder and deck uplift tie-downs; stone toe protection with planting, engineered logjams or log vanes at failed abutments</td></tr><tr><td>Marine pier ramps</td><td>Open or floating decking with uplift-resistant tie-downs</td></tr><tr><td>Roads and railways</td><td>Stabilize shoulders and embankments with erosion control blankets, turf reinforcement mats and revetments</td></tr><tr><td>Roads</td><td>Geotextile drainage blankets between pavement and subbase</td></tr><tr><td>Signs</td><td>Stronger panels and supports, multiple posts, stronger fasteners</td></tr></tbody></table>
Traffic counts for low-water crossing proposals, bridge and roadway designs, and specifications for the strengthened components.
Watch out · Govstar practitioner advice
Federal-aid roads and bridges usually fall under FHWA’s Emergency Relief program, not FEMA PA, so confirm the facility is FEMA-eligible before planning mitigation on it.