Short answer
Elevating or floodproofing electrical panels, HVAC, generators and fuel tanks; generator hookups and transfer switches; seismic bracing; flexible and restrained pipe joints and shut-off valves; submersible pumps; watertight sewer covers and sealed well heads; stronger power poles, elevated transformers, surge protection and redundant service to critical facilities; and anchored storage tanks.
<table class="pt-table"><thead><tr><th>System</th><th>Pre-approved measures</th></tr></thead><tbody><tr><td>Mechanical, electrical, plumbing</td><td>Seismic bracing; secure roof equipment against wind; elevate or dry floodproof panels, HVAC, generators and fuel tanks; backup power connections, camlocks and transfer switches</td></tr><tr><td>Pipes</td><td>Joint restraints, flexible connections, more ductile pipe; continuous lining or encasement; shut-off valves on underground pipes</td></tr><tr><td>Water and wastewater</td><td>Submersible or inline pumps; elevated or watertight sewer access covers; sealed or raised well heads; buttressed raw water intakes</td></tr><tr><td>Electric power</td><td>Looped service or redundancy to critical facilities; surge suppressors and lightning arrestors; elevated pad transformers; multi-pole transformer support; higher-rated poles with guys and anchors; H-frame cross-bracing; added guy-wires</td></tr><tr><td>Storage tanks</td><td>Anchor or stiffen base connections; self-initiating disconnects and shut-off valves</td></tr></tbody></table>
Equipment specifications, elevation or floodproofing designs, pole class ratings, and drawings for bracing, anchoring or redundant service.
Watch out · Govstar practitioner advice
Generator hookups (camlocks and transfer switches) are inexpensive and pay off in the next outage. Add them to any damaged critical facility’s electrical repair scope.