Short answer
Emergency protective measures and stabilization for an immediate threat are eligible. Appendix I’s parks table mainly lists what is not eligible: federally constructed beaches and shoreline works, private nonprofit parks and recreation facilities, natural unimproved features, destroyed crops, and private or homeowners’ association beaches and dunes. Engineered beaches qualify only under specific criteria; general Category G eligibility is in Chapter 8.
<table class="pt-table"><thead><tr><th>Category</th><th>Eligible</th><th>Not eligible</th><th>Other considerations</th></tr></thead><tbody><tr><td>B: Emergency</td><td>Bracing, shoring, barricades, fencing, sandbagging, and emergency repairs or stabilization for an immediate threat</td><td>Urgent work that restores pre-disaster design and function under codes and standards (that is permanent work, not emergency work)</td><td>None</td></tr><tr><td>G: Restoration</td><td>Not listed in Table 45; see Chapter 8 for Category G eligibility</td><td>Federally constructed beaches or shoreline protection; PNP parks and recreational facilities, including their roads, buildings and utilities; natural, unimproved features; destroyed crops; private and homeowners’ association beaches or dunes</td><td>Engineered beaches are subject to specific eligibility criteria</td></tr></tbody></table>
Records showing beaches or shoreline features were engineered and maintained, and documentation of supporting facilities such as roads, buildings and utilities within parks.
Watch out · Govstar practitioner advice
Urgent work that actually restores a park facility to its pre-disaster design is permanent work, not emergency work, with a different deadline and documentation. Label it correctly from the start.