From declaration date (44 CFR § 206.204(c)). Evaluated for continuous urgency.
Additional damage reasonably expected within 5 years from incident (44 CFR § 206.221(c)).
Threshold for full tree/stump removal + hole backfill reimbursement vs. flush-cut only.
Prescriptions, medical ER delivery, and non-congregate meals cap before formal extension.
FEMA Public Assistance (PA) funding for emergency work is authorized following a Presidential declaration for work that must be performed immediately. Emergency work is divided into two distinct statutory categories: Category A (Debris Removal) and Category B (Emergency Protective Measures).
Exigent operations to rescue victims, stabilize injuries, and remove immediate mortal perils.
Measures countering sanitary hazards, biohazards, contaminated water, disease vectors, or structural collapse.
Safeguarding publicly or privately improved structures, engineered facilities, or contents (44 CFR § 206.221(d)).
Mitigate additional destruction reasonably expected to manifest within a 5-year event horizon (44 CFR § 206.221(c)).
Under 44 C.F.R. § 206.221(c), an "immediate threat" is defined as the threat of additional damage or destruction from an incident that can reasonably be expected to occur within five years of the declared incident.
Source Case Example: Post-fire rainfall triggering mudslides and debris flows in an area scorched by a Presidentially declared wildfire. Even though rainfall is not wildfire, emergency stabilization to eliminate threats from rain events occurring within 5 years is fully eligible under the wildfire declaration.
Emergency work must be the legal responsibility of an eligible applicant under 44 C.F.R. § 206.223(a)(3).
| Small Projects Criteria | Large Projects Criteria |
|---|---|
Detailed description of emergency work performed. Certification Option: Applicants may certify to the following requirements in lieu of upfront comprehensive documentation:
| Detailed description of emergency work performed. Detailed description of the immediate threat. Evidentiary Records: Comprehensive technical reports, certified safety inspector evaluations, engineering assessments, and contemporaneous photographs substantiating the presence of an immediate threat if not visually self-evident. Note: FEMA utilizes attribute-based sampling to audit supporting documentation for PA projects. |
Debris removal operations (clearance, collection, staging, reduction, recycling, and final disposal) are eligible for PA reimbursement if the work is determined to be in the public interest.
Under 44 C.F.R. § 206.224(a), debris removal is in the public interest if necessary to:
Snow is NOT debris. Snow removal, road clearing, and salting are never eligible under Category A; they are restricted exclusively to Category B emergency protective measures when specifically declared by the President.
Recognized Forms of Debris: Vegetative debris, construction and demolition (C&D) debris, sand, mud, silt, gravel, rocks, boulders, white goods, and vehicle/vessel wreckage.
| Small Projects Submittals | Large Projects Submittals |
|---|---|
|
|
Vegetative debris still standing or rooted is eligible only if damaged by the declared incident to the extent that it poses an immediate threat to life, public health and safety, or improved property. Routine pruning, landscaping, and pre-existing decay are strictly ineligible.
Broken/hanging limbs over improved property or public facilities (sidewalks, trails, playgrounds).
Private Property Limbs: Eligible ONLY if extending over public ROW, posing an immediate threat, and cut from ROW without entering private property.
Standing tree with structural split, severe lean, or root system damage certified by a qualified individual (TRAQ / Certified Arborist / Forester).
Dislodged stumps requiring mechanical extraction.
Eligible only when necessary to eliminate an immediate threat to life, public health and safety, or improved property.
FEMA mandates volume reductions for inefficient loading methods to ensure cost-effectiveness:
Hand-loaded vegetative debris achieves only half mechanical compaction. FEMA funds only 50% of monitor-observed capacity.
Cannot achieve full compaction. FEMA caps reimbursement at 85% of certified capacity.
Tipping Fees: Variable operating costs (labor, power) and fixed costs (permits, closure, equipment) are eligible. Taxes for non-landfill general services and loss of landfill capacity value are INELIGIBLE.
Debris removal from private property is typically the owner's legal responsibility and generally ineligible. However, when catastrophe leaves debris so widespread that it threatens public health, safety, or community economic survival, FEMA may approve PPDR.
Unrestricted Public Access: If frequently traveled without gates/guards, removal is demonstrably in public interest (no extra documentation needed).
Restricted Access / Gated: Applicant must prove public interest to FEMA. Driveways are ineligible.
Evaluated against public health factors: open/accessible yards next to sidewalks, debris height/volume, rodent vectors, community density, and % homes destroyed.
Ineligible by default (commercial insurance expected). Rare exceptions require FEMA Regional Administrator approval for critical economic viability. Commercial debris placed on ROW is barred.
Emergency protective measures conducted before, during, and after an incident are eligible if they eliminate or lessen immediate threats to lives, public health, or safety, or eliminate/lessen immediate threats of significant additional damage to improved property in a cost-effective manner.
Eligible emergency protective measures include, but are not limited to, the following life-safety activities:
Eligible emergency measures to avert catastrophic secondary property destruction include:
Because emergency response is fundamentally a governmental police power, PNPs face distinct statutory boundaries:
If a PNP provides general emergency services (ambulance, animal control, 211, firefighting) at the request of an SLTT government under a written agreement:
Applicants may claim extra operational expenses incurred due to emergency service spikes, but under stringent boundaries:
| Eligible Increased Operating Costs | Ineligible Operating Costs (Even Temporary) |
|---|---|
|
|
Meals for emergency personnel and EOC staff are eligible only if individuals do not receive per diem and one of three conditions is satisfied:
FEMA reimburses SLTT governments for sheltering and evacuation operations. Congregate sheltering delivers shared temporary refuge, while non-congregate sheltering (NCS) provides private lodging under strict exigent circumstances.
Approved only under exigent conditions when congregate facilities are destroyed, insufficient, or revoked by owners.
Extensions are granted in 30-day increments (RA approves up to 6 months from the declaration; FEMA HQ beyond 6 months). To remain eligible past Day 30, each household must satisfy all five tests:
When an impact-state’s sheltering needs exceed capacity, mutual aid or host agreements allow neighboring states/tribes to shelter evacuees.
Household Pets: Domesticated animals traditionally kept in homes for pleasure (dogs, cats, birds, rabbits, rodents, turtles). Excludes: livestock, farm animals, racing animals, amphibians, fish, and all reptiles except turtles.
Service Animals (ADA): Dogs (and miniature horses) individually trained to do work or perform tasks for individuals with disabilities.
Assistance Animals (HUD): Animals providing functional assistance or emotional support that alleviates identified disability symptoms.
Microchipping, GPS tags, and electronic tracking used during evacuation are fully eligible.
Specific criteria govern high-cost, high-liability emergency operations including structural razing, essential community facility relocation, severe snow assistance, and coastal protective berms.
Eligible only when partial or complete collapse is imminent and poses an immediate threat to the general public (PAPPG v5.0 pp. 154–156).
If an applicant provides essential community services at a facility that is unsafe, inaccessible, or destroyed, temporary relocation is eligible (PAPPG v5.0 pp. 156–160).
Education, election/polling, police, fire, emergency medical care, homeless shelters, prisons, and utility administration. Essential support facilities (laundry, cooking, student dorms, parking) are also eligible.
Ineligible Services:Museums, zoos, community centers, athletic stadiums, houses of worship, libraries, senior centers, rehab centers, and vocational training facilities.
Assistance for snow removal is strictly limited and authorized only under major disaster snowstorm declarations (never under Emergency declarations) (PAPPG v5.0 pp. 160–161; Appendix K).
Reimbursement is limited to a single continuous 48-hour window designated by each applicant to address critical emergency needs. State DOTs may designate separate 48-hour windows for different geographic districts.
24-Hour Extension (72h Total): FEMA may extend the period by 24 hours where snowfall exceeds the record by at least 50 percent.
Must be temporary in nature to eliminate immediate peril. Permanent restoration in exigent situations is permanent work, not Category B (except power restoration). (PAPPG v5.0 pp. 161–163)
Operation Blue Roof: Direct Federal Assistance (DFA) through USACE only; provides plastic sheeting for safely habitable homes.
Eligible to eliminate immediate threats to improved property. Confined strictly to the area of threat (not entire hillside).
Measures: drainage, rip rap, partial excavation, rock toes, soldier piles, and debris barriers.
Eligible if post-incident dune profile is lower than the 5-year Total Water Level (TWL = 5-year Still Water Level + Wave Runup) (PAPPG v5.0 pp. 164–165).
Volume Cap: Maximum 6 cubic yards per linear foot of sand above the 5-year SWL, or the amount needed to restore the pre-incident profile, whichever is less. Dune grass is eligible only when a permit requires it as a uniform practice.
Test real-world field scenarios against PAPPG v5.0 Chapter 7 policies, compute debris truck deductions, simulate beach berm eligibility, and plan congregate shelter equipment. Each result shows the PAPPG v5.0 pages it rests on.
Select operational parameters to evaluate immediate eligibility under PAPPG v5.0 Chapter 7 rules.
Once a qualified individual (forester, TRAQ-qualified assessor or certified arborist) finds a tree hazardous, adjust the exposed root-ball percentage to see the line between full extraction and flush-cutting.
Calculates FEMA Public Assistance volume deductions for hand-loaded vegetative debris and missing solid tailgates (PAPPG v5.0 pp. 125–126).
Input the registered shelter census to calculate the maximum equipment FEMA funds under the PAPPG v5.0 ratios (pp. 142–145).
Calculates the 5-year Total Water Level (TWL) against the post-disaster primary dune crest to determine emergency berm eligibility (PAPPG v5.0 pp. 164–165).
These tools illustrate PAPPG v5.0 rules for planning and training. They do not replace FEMA’s eligibility determination for your project.
Ensuring reimbursement requires matching federal statutory authority and providing required submittals based on project threshold sizing.
FEMA will not fund work another federal agency has specific authority over, even when that agency doesn’t pay:
| Federal Agency | Statutory Authority / Scope | FEMA Public Assistance Eligibility Relationship |
|---|---|---|
| USACE (Army Corps of Engineers) | Federally maintained navigable channels, flood control works under RIP (PL 84-99), Operation Blue Roof DFA. | PA debris removal from federally maintained channels is ineligible. Flood fighting at RIP facilities is eligible (USACE can’t reimburse it), and RIP works are eligible for PA debris removal. |
| NRCS (Natural Resources Cons. Service) | Emergency Watershed Protection (EWP) & Flood prevention under PL 83-566 (WFPO). | Debris removal from flood works installed under NRCS PL 83-566 is ineligible for PA, even if NRCS lacks funds. Coordinate with NRCS to avoid duplicate funding. |
| FHWA (Federal Highway Admin) | Emergency Relief (ER) program for Federal-aid highways. | Repairs to federal-aid highways belong to FHWA, even if Emergency Relief doesn’t pay. Debris clearing on federal-aid ROWs is eligible under Cat A. |
| EPA vs. USCG | Oil and hazardous substance releases. EPA handles inland zones; USCG handles coastal zones. | Call them early. If EPA or the Coast Guard has authority over the release, FEMA may not fund your cleanup of it. |
| CDC (Disease Control) | Infectious disease response. | FEMA decides eligibility with the CDC and issues disaster-specific guidance. Mosquito abatement needs a public health official’s written validation and is limited to the increase over normal spending. |
PAPPG v5.0 pp. 68–69, 117–124, 135–137, 152–153.