Independent FEMA Public Assistance resource. Not affiliated with FEMA.DeclarationsRecovery GuidesStart hereReform watchContact
Asset valuation · RegistryOne record for insurers, FEMA and funding formulas

Smart Asset Registry

Most public entities keep three versions of the same building: one in GIS, one in the insurance schedule and one in the capital plan, each with a different name, value and address. A Smart Asset Registry replaces them with one engineering-grade, insurance-linked record per facility, so the numbers agree before a disaster and every claim, estimate and grant after it starts from the same facts.

For your insurerA statement of values that matches replacement cost, so you avoid coinsurance penalties and disputed claims.
For FEMAProof of pre-disaster condition, location and insurance, the facts that decide eligibility and the 50 percent test.
For any funding formulaExposure data that shows your share of a block grant or RAPID allocation is fair.

1The data dictionary

Minimum fields per facility

Six groups of fields cover what insurers, FEMA reviewers and formula-based programs ask for. Tags show who relies on each field: InsuranceFEMA PAPDA / damage inventoryFormula funding.

FieldWhat to recordUsed by
1. Identity
Asset IDOne permanent ID shared by GIS, finance, insurance and Grants PortalInsuranceFEMA PAPDAFormula
Name, owner, departmentLegal owner and the department responsible for maintenanceFEMA PAInsurance
LocationStreet address and latitude/longitude of the facility (not the parcel centroid)Damage inventoryFormulaFEMA PA
Facility type and useBuilding, road, bridge, water, power, park; current function and occupancyFEMA PAInsurance
2. Engineering
ConstructionConstruction class, year built, major renovations, number of stories, gross square feetInsuranceFEMA PA
Code eraBuilding code in effect at construction and at last major renovationFEMA PA (code upgrades)
ElevationsFirst-floor elevation and the elevation of critical equipment (switchgear, generators, pumps)FormulaFEMA PA
3. Condition
Pre-disaster conditionDated photos, inspection reports and a condition ratingFEMA PAInsurance
Maintenance historyWork orders and repairs, showing the facility was maintainedFEMA PA
4. Valuation
Replacement cost valueRCV with its cost source, date and location factor; by building system where possibleInsuranceFEMA PA (50% test)Formula
Depreciation and ACVEffective age, useful life and actual cash valueInsurance
Contents and equipmentValue of contents and major fixed equipmentInsuranceFEMA PA
5. Hazard
FloodFEMA flood zone, base flood elevation and depth relative to the first floorFEMA PA (flood reductions)Formula
Wind, seismic, wildfireDesign wind speed, seismic category and wildfire exposureFormulaInsurance
6. Insurance and grants
Policy linkPolicy number, schedule line, limits, sublimits, deductibles, coinsuranceInsuranceFEMA PA
Obtain-and-maintainInsurance required by any earlier FEMA grant: disaster, project, hazard and amountFEMA PA
Federal funding historyEarlier FEMA projects on the facility and their closeout statusFEMA PAFormula

2Where the registry is used

The damage-to-dollars chain
Insurance renewalFeeds the statement of values; flags facilities insured below replacement cost.
Before hazard seasonA frozen baseline proves pre-disaster condition and value.
Preliminary damage assessmentQuick, credible damage estimates for the declaration request.
Damage inventoryEvery damaged site listed with ID and coordinates within days.
Project formulationPre-disaster condition, code era and RCV for each project.
Closeout and auditA record that ties value, damage, insurance and cost together.
Under today’s rules

What it protects

  • Eligibility: pre-disaster photos and maintenance records answer the most common FEMA challenge, that damage was pre-existing or deferred maintenance.
  • Insurance: obtain-and-maintain tracking keeps facilities eligible; FEMA deducts actual and anticipated insurance (44 CFR 206.250).
  • Insurance after recovery: property improved with federal funds must be insured like your other property (2 CFR 200.310).
  • Records: grant records must generally be kept three years after the final expenditure report (2 CFR 200.334).
Under proposed reforms

What it would decide

  • RAPID: the Review Council’s report would have states keep a public registry of facilities receiving permanent repair funding, with insurance details. See RAPID Explained.
  • Higher federal share: proving insurance on past projects and reporting damage data within 30 days are among the Council’s required criteria.
  • Allocation: under any lump-sum model, registry values are the evidence for a fair local share. See Section 428 model.

3Registry record builder

Interactive tool

Build one facility record and see how complete it is

Fill in what you know for one facility. The builder scores each field group and lists what to collect next. Download a CSV with these columns to start your registry in any spreadsheet or GIS. Nothing you enter leaves your browser.

1. Identity
2. Engineering
3. Condition
4. Valuation
5. Hazard
6. Insurance and grants

4From registry to rapid estimate

The first 72 hours

A registry proves its value in the first days after an event. Under today’s Public Assistance process it speeds the preliminary damage assessment, the damage inventory and project formulation. Under the upfront-funding models in the reform proposals, it is what turns a hazard reading into a facility-level dollar figure that holds up in review.

Five questions the registry should answer within 72 hours

1What was exposed?Asset IDs, footprints and criticality show which facilities sat inside the hazard area.
2How hard was it hit?Wind fields, flood depths and shaking maps read against each footprint and elevation.
3Which parts are vulnerable?Roof age, construction, equipment elevations and anchorage point to the components most likely damaged.
4What will it probably cost?Quantities, damage ratios and dated unit costs give a cost range for each facility.
5What is insured or eligible?Policy limits, deductibles and obtain-and-maintain status split the range into insured, eligible and local shares.

The damage-to-cost engine

Every term in a rapid estimate should trace to a registry field or a named source. The structure is simple enough to audit:

Σ ( component quantity × damage ratio × unit replacement cost × local cost index )
+ emergency work + debris + soft costs + code allowances + contingency + escalation
− insurance recoverable = Initial facility cost estimate (a range, not a final number)
TermWhere it comes fromRegistry field that feeds it
Component quantityGIS geometry and the facility’s component inventoryGross square feet, building systems
Damage ratioHazard intensity at the site read against a vulnerability curve for that constructionConstruction class, code era, first-floor and equipment elevations
Unit cost and local indexA named, dated cost source such as RSMeans, adjusted for locationReplacement cost value, cost source and date
Code allowancesDifference between the code at construction and the codes and standards that apply to the repairCode era
Insurance recoverablePolicy schedule, limits, sublimits and deductiblesPolicy link, insured limit
An engine estimate is a starting range for triage and cash-flow planning. Under today’s rules FEMA still validates eligible scope and cost, and actual and anticipated insurance is deducted from the eligible amount (44 CFR 206.250).

Why a trigger needs the registry

A parametric trigger measures how hard the wind blew or how deep the water rose. It cannot see how old a roof is or whether the switchgear is in the basement. The gap between what a trigger pays and what repair actually costs is basis risk, and engineering fields in the registry are what narrow it.

HazardWhat a trigger measuresWhat the trigger cannot seeRegistry fields that close the gap
Hurricane wind and surgeWind speed, surge heightRoof age and uplift rating, envelope condition, contents location, salt-water exposureRoof type and year, design wind speed, first-floor and equipment elevations
Riverine and coastal floodFlood depthFirst-floor elevation, below-grade utilities, flood duration, contaminationFlood zone, base flood elevation, first-floor and equipment elevations
Cloudburst (rainfall)Rainfall intensitySewer surcharge, blocked inlets, overland flow, local topographySewershed, below-grade spaces, equipment elevations
EarthquakeGround shakingRetrofit status, soil amplification, lateral system, equipment anchorageConstruction class, code era, retrofit year, anchorage
WildfireFire perimeter and intensityDefensible space, roof and siding class, smoke-sensitive HVACWildfire exposure, material class, HVAC filtration
Example: a regional flood trigger may confirm water reached +15 feet at a wastewater pump station. Only the registry shows whether the control panels and switchgear sit above or below that line, and that one fact can decide most of the loss.

Estimate classes: know what each number can be used for

Early numbers get treated as final numbers unless everyone agrees on what each estimate is for. GovStar uses five classes, from the first parametric figure to the reconciled closeout cost.

ClassUse it forDo not use it for
R-1 Parametric advanceImmediate liquidity and state cash-flow planningA final fixed-cost grant
R-2 Registry-based initialAllocation and inspection triageProject closeout
R-3 Engineer-validatedProject valuation for simpler facilitiesFinal valuation of complex lifeline facilities
R-4 Contract awardTruing up obligations to the bid marketAvoiding procurement review
R-5 Final reconciledAudit, closeout and the final duplication-of-benefits checkReopening the file without fraud or material error
Code era matters at every class. It decides whether a repair restores the facility to its original standard or must meet the codes and standards that apply now, which is often the largest single driver of project cost.

5Building it

Start small, then deepen
Level 1 · Months 0–6

One list everyone shares

  • Assign permanent asset IDs and coordinates.
  • Match every facility to its insurance schedule line.
  • Record obtain-and-maintain requirements from past disasters.
Level 2 · Months 6–18

Values you can defend

Level 3 · Ongoing

A living record

  • Freeze a dated baseline before each hazard season.
  • Add photos and inspections on a schedule.
  • Reconcile to the insurance renewal every year.
Start with the facilities that carry the most value and exposure: treatment plants, pump stations, emergency operations centers, fire stations and schools. A complete record for 20 percent of your facilities usually covers most of the value at risk.

6Governance

Keeping it trustworthy
Ownership

Named owners

  • Each department owns its facilities’ records and signs off annually.
  • One registry steward manages IDs, standards and the frozen baselines.
Quality

Show the confidence

  • Mark each value as field-verified, engineer-reviewed or modeled.
  • Have a professional engineer review lifeline facilities.
Security

Protect sensitive data

  • Critical infrastructure details may be sensitive; publish only what is required and restrict the rest.
  • Keep version history so you can show what you knew before the disaster.

Deeper reading

A planning framework, not a FEMA requirement or form. Not engineering, insurance or legal advice and not FEMA guidance. GovStar is independent and not affiliated with FEMA. Related: Replacement Cost, Depreciation and Insurance · FEMA PA Policy on Insurance · Funding & Valuation Center.