Damage assessment · Interactive toolSOV × UniFormat × field damage %

ROM Damage Estimator

Build a rough order of magnitude (ROM) initial damage estimate for one building in minutes. Start from the building’s insured value on your Statement of Values (SOV), spread it across UniFormat divisions, and apply the percentage of damage you observe in the field.

Step 1Set the baselineBuilding replacement cost value (RCV) from the SOV
Step 2Allocate by UniFormatUse the model weights or set your own, within guided ranges
Step 3Apply field damage %Your walkthrough estimate for each division
Step 4Add loss adjustmentsDemolition, drying, code upgrades and repair premium
What a ROM is for. A ROM gives you a defensible first reserve number before line-item scoping. Use it for preliminary damage assessments, early insurance reporting, budgeting and to check a FEMA estimate, including a RAPID Cost Estimating package. It is not a FEMA project cost estimate and will not replace a scoped estimate.

1Baseline building value from the SOV

Building limit only
Appears on the printout and CSV.
Building limit only. Leave out contents (BPP), business interruption and detached structures.
Used for $/SF figures.
How current is the value?
From a recent appraisal or cost data. Flags an underinsured or outdated SOV.

2–3Allocate by UniFormat and apply field damage

RSMeans-style model weightings
The default shares come from a typical RSMeans square-foot model for a low-rise municipal office. For any other building, set your own weights in the component weight section below.
Or clear the box and enter your own rate in the table.
UniFormat divisionWeight %SOV allocationField observationDamage %Est. direct damage

2ASet component weights with your judgment

Any building type

No two buildings split their value the same way. A warehouse is mostly shell, a hospital mostly services, a courthouse heavy on interiors. Use your knowledge of the building to set each component’s share of the total value. Each one has a typical range (green band) that fits most public buildings and hard limits the tool will not go past. If you go outside the typical range, record why: that note is what makes the estimate defensible.

Total of weights100.0%
Balanced

Typical ranges and limits are GovStar guidance for planning-level allocation across common public building types, not published cost data. Lock the components you are confident about, then use Balance to 100% to spread the difference across the rest.

4Loss-specific adjustments

Not in a standard SOV

An SOV reflects the cost of new construction, not of restoring a damaged building. Add allowances for work that a loss creates.

Tear-out of wet drywall, insulation and roofing: typically 10–20%.
Selective repair around an existing building: typically 15–25% labor inefficiency.
Water extraction, dehumidification, tarping, board-up.
Upgrades triggered by the damage, such as electrical or ADA.

5Initial damage estimate

Rough order of magnitude
Baseline value–
Direct damage–
Loss adjustments–Demolition, premium, drying, code
ROM initial estimate–
Estimated direct damage (A–E plus soft costs)–
Demolition & debris removal–
Repair vs. new construction premium–
Emergency mitigation & drying–
Code upgrade / ordinance & law–
ROM initial damage estimate–

6Pair the ROM with your insurance file

Avoid duplication-of-benefits deductions

FEMA deducts actual and anticipated insurance from eligible costs, and an unclear insurance file usually leads to a larger deduction than you will actually receive. The ROM and the insurance file start from the same SOV line, so build them together.

Same baseline

Use the same SOV line

  • Take the building value from the scheduled location your policy covers.
  • Keep contents, business interruption and detached structures out of the ROM, just as the settlement should keep them in separate buckets.
  • Keep the policy, declarations and deductible schedule in force on the date of loss with the ROM.
Map the dollars

Line up ROM lines with settlement buckets

  • Divisions A–E and soft costs: building and permanent repair proceeds.
  • Demolition and tear-out: part of the permanent repair, not site debris removal (Category A).
  • Emergency drying and tarping: emergency work, which can overlap extra-expense proceeds.
Check the adjuster

Compare the ROM with the claim

  • Put the ROM next to the adjuster’s line-item estimate, division by division.
  • A large gap points to missed scope, an undervalued SOV or a coinsurance problem.
  • Record why the numbers differ before FEMA asks.
Before the project is obligated, assemble the five-part insurance package: (1) the policy baseline on the date of loss, (2) proofs of loss and adjuster estimates, (3) a settlement split by purpose, (4) the final settlement or claim status, and (5) a crosswalk from each insurance dollar to its FEMA project. Use the interactive insurance documentation checklist, then enter the ROM’s blended damage in that page’s capital stack calculator to see what insurance, FEMA and your agency would each pay.

7UniFormat reference for the allocation

RSMeans square-foot model structure

RSMeans square-foot models list building elements by UniFormat II, from A (Substructure) through G (Sitework), instead of by trade. Each assembly’s cost is converted to a cost per square foot of floor area and a percent of the total, then markups for general conditions, overhead and profit, and design fees are added at the bottom. The divisions below are the ones you allocate to and assess in the field.

DivisionLevel 2 subsystemsTypical model assemblies to inspectTypical share*
A – SubstructureA10 Foundations; A20 BasementStrip and spread footings, slab on grade, basement walls5–7%
B – ShellB10 Superstructure; B20 Exterior Enclosure; B30 RoofingFloor and roof structure, exterior walls, windows, exterior doors, roof membrane and insulation28–33%
C – InteriorsC10 Interior Construction; C20 Stairs; C30 Interior FinishesPartitions, interior doors, fittings, stairs, wall, floor and ceiling finishes18–22%
D – ServicesD10 Conveying; D20 Plumbing; D30 HVAC; D40 Fire Protection; D50 ElectricalElevator, fixtures and water distribution, rooftop HVAC and ductwork, sprinklers, service, lighting, fire alarm and data28–34%
E – Equipment & FurnishingsE10 Equipment; E20 FurnishingsFixed casework, counters, blinds (loose furniture is budgeted separately)1–3%
F – Special ConstructionF10 Special Construction; F20 Selective DemolitionVaults, special structures; demolition is added in Step 40%
G – Building SiteworkG10–G40Parking, walks, utilities, landscaping: estimate separatelyExcluded

*Typical direct-cost shares for a 2-story, 10,000 SF brick-veneer municipal office before local cost multipliers and sitework. In the model, general conditions and contractor overhead and profit typically add 15–25% and design fees 7–9%; the default 10% soft-cost line is a simplified share of the total value.

Before you start

Check the SOV value

  • Use the building limit for this structure only.
  • Confirm the value is current replacement cost. An old or low value understates every number on this page.
  • Record the gap as a contingency risk.
In the field

Assess by division

  • Walk the building by UniFormat division, not by room.
  • Note what you see: roof membrane torn, ceilings saturated, rooftop units damaged.
  • Photograph each division you rate above 0%.
After the ROM

Move to a scoped estimate

  • Break high-damage divisions into Level 2 and Level 3 assemblies.
  • Price quantities with current local unit costs.
  • Use the ROM to check FEMA’s and the insurer’s numbers.

This tool produces a rough order of magnitude for planning and early reporting. Default weights are typical model shares and judgment ranges are GovStar guidance, not data for your building. It is not engineering, insurance or legal advice, is not a FEMA cost estimate, and does not determine FEMA eligibility. GovStar is independent and not affiliated with FEMA.