Every resource, by topicGovStar Library →Have a question?Request help →FEMA pays to replace a damaged facility only when the eligible cost to repair it is more than half the cost to replace it. The first numbers you have after a disaster, a FEMA RAPID Cost Estimating package, a ROM or your insurer’s initial statement of loss, all carry costs that this test leaves out and all carry wide uncertainty. This tool strips out what does not count, shows how far the ratio could move, and tells you whether the answer is safe to act on, including before you accept a Section 428 fixed-cost offer.
A facility is repairable when disaster damage does not exceed 50 percent of the cost of replacing it to its pre-disaster condition and repair is feasible. If the eligible repair cost is more than 50 percent of the replacement cost, replacement is eligible. FEMA compares only eligible repair work with eligible replacement work, so both numbers are “clean” figures, not the totals on an estimate or a claim.
FEMA’s replacement scope and cost for a destroyed facility, built from aerial imagery, assessor records and other public data. See RAPID Cost Estimating.
The ROM Damage Estimator splits the SOV value across UniFormat divisions and applies field damage percentages.
The adjuster’s first estimate or statement of loss is often the earliest line-item figure you have. It is built for the policy, not for FEMA.
Enter figures from your source. Leave a field at 0 if it does not apply. Everything is calculated in your browser; nothing is sent anywhere. Load the example to see how it works.
| Step | Repair | Replacement | Ratio |
|---|
The stressed range is the widest result from moving repair and replacement in opposite directions by their accuracy. Accuracy defaults are GovStar planning guidance by estimate class, not FEMA figures. FEMA validates both estimates and makes the determination.
Under the alternative procedures, a large permanent work project can be funded on a fixed estimate instead of reconciled to actual cost. You give up true-ups in exchange for flexibility. That makes the repair-or-replace answer and the accuracy of the estimate a one-time decision: whatever class of number the offer rests on becomes your budget.
| Question | Standard large project | Section 428 fixed estimate |
|---|---|---|
| Cost overruns | Eligible overruns can be added through a version or at closeout | You agree to cover actual costs above the estimate |
| Underruns | Returned at reconciliation | FEMA may let you use excess funds for cost-effective risk reduction or to improve future PA operations or planning |
| Rebuilding something different | Alternate projects are generally reduced to 90 percent of the federal share | FEMA’s alternative procedures guidance removes that reduction |
| Grouping facilities | One project per facility or group of similar work | Fixed estimates can be consolidated into one subaward |
| Checking the estimate | FEMA validates; differences are resolved through versions and appeals | You can ask for an independent expert panel when the eligible federal share is estimated at $5 million or more, and ask FEMA to consider a certified estimate from a mutually agreed licensed engineer |
| Insurance | Actual and anticipated proceeds are deducted (44 CFR 206.250) | Same: proceeds still reduce the award |
| Procurement and records | 2 CFR 200.317–200.327; records kept three years after the final expenditure report (2 CFR 200.334) | Same rules apply to the work and to any use of excess funds |
A ROM, a statement of loss or a public-data package is a screening figure. If the stressed range crosses 50 percent or the overrun exposure is more than you could fund, ask for an engineer-validated (R-3) estimate before you agree.
The fixed amount follows the scope. Agreeing to a repair estimate when the facility is near 50 percent locks in the smaller number. Document the 50% calculation with the offer.
Insurance still comes off the top. An early statement of loss is rarely the final settlement. Use the insurance documentation checklist so the anticipated amount FEMA deducts is the amount you will actually receive.
A hybrid approach uses fast, formula-based numbers to get cash and decisions moving, then replaces them with better numbers before anything is locked. Each step uses the right class of estimate for the decision in front of you.
| Repair vs. replacement | 44 CFR 206.226(f); FEMA Recovery Policy 9524.4 and its 2015 clarification; FEMA IS-1021 lessons on 50% Rule eligible costs; PAPPG v5, Chapter 8 |
| Substantial damage | 44 CFR 59.1 (market value test, administered locally) |
| Alternative procedures | Stafford Act §428, 42 U.S.C. 5189f(e)(1); FEMA Public Assistance Alternative Procedures guidance; PAPPG v5, Appendix G; FEMA IS-1000 on excess funds |
| Insurance | 44 CFR 206.250–206.253; FEMA PA Policy on Insurance |
| Procurement and records | 2 CFR 200.317–200.327; 2 CFR 200.334 |
A planning and screening tool. FEMA validates eligible scope and cost and makes every repair-or-replacement determination. Not engineering, insurance or legal advice and not FEMA guidance. GovStar is independent and not affiliated with FEMA.